The Exploratory Factor Analysis of Quality Performance Indicators in Building Projects in Lagos State
Authors
Department of Building, Bamidele Olumilua University of Education, Science and Technology, Ikere-Ekiti, Ekiti State (Nigeria)
Article Information
DOI: 10.51584/IJRIAS.2026.11060228
Subject Category: Management
Volume/Issue: 11/6 | Page No: 3027-3040
Publication Timeline
Submitted: 2026-06-25
Accepted: 2026-06-30
Published: 2026-07-13
Abstract
This paper accessed the view of building construction professionals on the factor that influences the usage of quality performance indicators in construction industry. A total of twenty-six (26) factors that influence the use of quality performance indicators were obtained from literature. The questionnaire survey was distributed to randomly selected respondents from a combination of clients, consultants, contractors, site engineers, project builder project managers. A total of one hundred (100) questionnaires were used for this research using tools such as percentile, frequency, mean score rating, standard deviation and factor analysis. Findings of the study shows that; Cost of quality, Inspection and testing of executed works, Use of less-substandard materials, Untimely project delivery and Non-enforcement of statuary requirement are the first five (5) ranked factors that influences the use of quality performance indicators by professionals. This study concluded that the identified factors which were further categorized using factor analysis into: project Quality factors, workforce related factors, project delivery factors, risk related factors and resource related factors are relevant and important to each aspect of construction and for easy implementation of these factors with a view of enhancing project delivery.
Keywords
Building Construction Professionals, Construction Project, Quality Performance Indicator, Quality management, Exploratory Factor Analysis
Downloads
References
1. Abdelalim, A. M., & Eldesouky, M. A. (2021). Evaluating contracting companies according to quality management system requirements in construction projects. International Journal of Engineering, Management and Humanities, 2(3), 158–169. [Google Scholar] [Crossref]
2. Abd El-Karim, M., El Nawawy, O., & Abdel-Alim, A. (2017). Identification and assessment of risk factors affecting construction projects. HBRC Journal, 13(2), 202–216. https://doi.org/10.1016/j.hbrcj.2015.05.001 [Google Scholar] [Crossref]
3. Abdulkareem, Y. A., & Adeoti, E. K. A. (2010). Quality control compliance in the Nigerian construction industry: A case study of projects in Kwara State. Global Journal of Research Engineering, 11(1), 25-32. [Google Scholar] [Crossref]
4. Abdul-Rahman, H., Takim, R., & Min, W. S. (2009). Financial-related causes contributing to project delays. Journal of Retail & Leisure Property, 8(3), 225–238. https://doi.org/10.1057/rlp.2009.11 [Google Scholar] [Crossref]
5. Adebayo, S. O. (2000). Improving Building Techniques “Proceedings of Workshops on Building Collapse: Causes, Prevention and Remedies. The Nigerian Institute of Builders, Lagos State. [Google Scholar] [Crossref]
6. Adenuga, O. A. (2013). Factors affecting quality in the delivery of public housing projects in Lagos State, Nigeria. International Journal of Engineering and Technology, 3(3), 332–344. [Google Scholar] [Crossref]
7. Aliyu, A. A., Adamu, H., Abdu, A. A., & Singhry, I. M. (2015). Influence of building contractors' performance on construction process in Nigeria: A review of emerging literature. Journal of Energy Technologies and Policy, 5(8), 11–22. [Google Scholar] [Crossref]
8. Arditi, D., & Gunaydin, H. M. (1998). Factors that affect process quality in the life cycle of building projects. Journal of Construction Engineering and Management, 124(3), 194–203. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:3(194) [Google Scholar] [Crossref]
9. Cavana, R., Delahaye, B., & Sekeran, U. (2001). Applied business research: Qualitative and quantitative methods. John Wiley & Sons. [Google Scholar] [Crossref]
10. Chan, A. P. C., Chan, D. W. M., & Ho, K. S. K. (2003). An empirical study of the benefits of construction partnering in Hong Kong. Construction Management and Economics, 21(5), 523–533. https://doi.org/10.1080/0144619032000056162 [Google Scholar] [Crossref]
11. Dantata, S. (2007). General overview of the Nigerian construction industry (Master's thesis, Massachusetts Institute of Technology). [Google Scholar] [Crossref]
12. Dikko, K. (2013). Establishing the status of Nigerian building design firms based on the European Construction Institute total quality management matrix. In Proceedings of the 29th Annual ARCOM Conference (pp. 255–264). Association of Researchers in Construction Management. [Google Scholar] [Crossref]
13. Fagbemi, A. O. (2008). Assessment of quantity surveyors' service quality in Lagos State, Nigeria (Unpublished master's thesis). Department of Quantity Surveying, Federal University of Technology, Akure, Nigeria. [Google Scholar] [Crossref]
14. Gosselin, M. (2005). An empirical study of performance measurement in manufacturing firms. International journal of productivity and performance management, 54(5/6), 419-437. [Google Scholar] [Crossref]
15. Hamad, R. J., Tayeh, B. A., & Al Aisri, H. A. (2021). Critical factors affecting the success of construction projects in Oman. Journal of Sustainable Architecture and Civil Engineering, 29(2), 121-138. [Google Scholar] [Crossref]
16. Hanson, D. N., & Mbachu, J. (2006). Causes of client dissatisfaction in the South African building industry and ways of improvement: Contractors' perspectives (Master's thesis). University of the Witwatersrand, Johannesburg, South Africa. [Google Scholar] [Crossref]
17. He, J., Morrison, A. M., & Zhang, H. (2021). Being sustainable: The three-way interactive effects of corporate social responsibility, green human resource management, and responsible leadership on employee green behavior and task performance. Corporate Social Responsibility and Environmental Management, 28(3), 1043–1054. https://doi.org/10.1002/csr.2104 [Google Scholar] [Crossref]
18. Hijazi, R. (2021). Factors hindering quality performance in construction projects: an empirical study. Review of Applied Socio-Economic Research, 21(1), 47-57. [Google Scholar] [Crossref]
19. Ibrahim, A. D. (2011). Development of procurement strategy for infrastructure in Nigeria: Case of primary Healthcare Facilities. Malaysian Construction Research Journal, 8(1), 71-87. [Google Scholar] [Crossref]
20. Ingle, P. V., & Mahesh, G. (2022). Construction project performance areas for Indian construction projects. International Journal of Construction Management, 22(8), 1443–1454. https://doi.org/10.1080/15623599.2020.1848511 [Google Scholar] [Crossref]
21. International Organization for Standardization. (2015). Quality Management Systems-Fundamentals and Vocabulary (ISO 9000: 2015). ISO. [Google Scholar] [Crossref]
22. Joshua, O., Olusola, K. O., Ogunde, A. O., Amusan, L. M., Ede, A. N., & Tunji-Olayeni, P. F. (2017). Assessment of the utilization of different strength classes of cement in building constructions in Lagos, Nigeria. International Journal of Civil Engineering and Technology, 8(9), 1221-1233. [Google Scholar] [Crossref]
23. Kheni, N. A., and Ackon, F. (2015). “Impact of total quality management practices on construction project quality performance in developing countries: Study of construction businesses in Ghana.” International Journal of Management Science, 2(3): 35–51. [Google Scholar] [Crossref]
24. Kulatunga, U., D. Amaratunga, Haigh,R and Baldry, D. (2005). “Performance measurement applications in facilities management: An investigation into future directions.” Paper presented at the 11th Joint CIB International Symposium—Combining Forces, Helsinki, Finland. [Google Scholar] [Crossref]
25. Lindhard, S. M., Neve, H. H., Kalsaas, B. T., Møller, D. E., & Wandahl, S. (2022). Ranking and comparing key factors causing time-overruns in on-site construction. The International Journal of construction management, 22(14), 2724-2730. https://doi.org/10.1080/15623599.2020.1820659 [Google Scholar] [Crossref]
26. Mahamid, I. (2020). Study of the relationship between rework and labor productivity in building construction projects. Revista de la Construcción, 19(1), 30–41. https://doi.org/10.7764/RDLC.19.1.30-41 [Google Scholar] [Crossref]
27. Mbugua, L. M., Harris, P., Holt, G. D., & Olomolaiye, P. O. (1999). A framework for determining critical success factors influencing construction business performance. In Proceedings of the 15th Annual ARCOM Conference (Vol. 1, pp. 255–264). Association of Researchers in Construction Management. [Google Scholar] [Crossref]
28. Modi, H. J., Pathak, V. B., & Yadav, N. B. (2017). Analysis of crucial contract clauses and quality factors in construction projects using the relative importance index (RII) method. International Journal of Emerging Technologies and Innovative Research, 4(5), 239–243. [Google Scholar] [Crossref]
29. Neely, A. (1999). The performance measurement revolution: Why now and what next? International Journal of Operations & Production Management, 19(2), 205–228. https://doi.org/10.1108/01443579910247437 [Google Scholar] [Crossref]
30. Newton, L. A., and Christian, J. (2006). “Impact of quality on building costs.” Journal of Infrastructure Systems, 12(4): 199–206. https://doi.org/10.1061/(ASCE)1076-0342(2006)12:4(199) [Google Scholar] [Crossref]
31. Nnorom, S. U., & Olagbaju, O. O. (2020). Principals' quality management skills as determinants of goal attainment in secondary schools in Ahiazu Mbaise local government area, Imo state. International Journal on Integrated Education, 3(10), 87-91. [Google Scholar] [Crossref]
32. Ojo, A. M., & Ijatuyi, O. O. (2014). Defective construction in residential buildings: a study of sunshine gardens, Akure Nigeria. International Journal of Civil Engineering, Construction and Estate Management, 1(2), 16-30. [Google Scholar] [Crossref]
33. Ong'ondo, C. B., Gwaya, A. O., & Masu, S. (2019). Appraising the performance of construction projects during implementation in Kenya, 1963–2018: A literature review perspective. Journal of Construction Engineering and Project Management, 9(2), 1–24. https://doi.org/10.6106/JCEPM.2019.9.2.001 [Google Scholar] [Crossref]
34. Pillai, A. S., Joshi, A., & Rao, K. S. (2002). Performance measurement of R&D projects in a multi-project, concurrent engineering environment. International Journal of Project Management, 20(2), 165–177. https://doi.org/10.1016/S0263-7863(00)00056-9 [Google Scholar] [Crossref]
35. Ranawat, H. S., Bhadoriya, G., & Trivedi, M. (2018). Critical factors affecting the success of construction projects in Gwalior Division, India. International Journal of Applied Engineering Research, 13(11), 10108–10114. [Google Scholar] [Crossref]
36. Shayan, S., Kim, K. P., & Tam, V. W. Y. (2022). Critical success factor analysis for effective risk management at the execution stage of a construction project. International Journal of Construction Management, 22(3), 379–386. https://doi.org/10.1080/15623599.2019.1707857 [Google Scholar] [Crossref]
37. Sholanke, A. B., Fagbenle, O. I., Aderonmu, P. A., & Ajagbe, A. M. (2015). “Sandcrete block and brick production in Nigeria: Prospects and challenges.” IIARD International Journal of Environmental Research, 1(4), 1–17. [Google Scholar] [Crossref]
38. Smallwood, J., & Rossouw, J. H. (2008). The implementation of quality management systems in South African construction. In Proceedings of the RICS COBRA Construction and Building Research Conference. Dublin Institute of Technology, Dublin, Ireland. [Google Scholar] [Crossref]
39. Tabachnick, B. G., & Fidell, L. S. (2013). Using multivariate statistics (6th ed.). Pearson. [Google Scholar] [Crossref]
40. Takim, R., & Akintoye, A. (2002). Performance indicators for successful construction project performance. In Proceedings of the 18th Annual ARCOM Conference (Vol. 2, pp. 545–555). Association of Researchers in Construction Management. [Google Scholar] [Crossref]
41. Thompson, R. C., Jr., Su, Y., & Lucko, G. (2017). Measuring project performance inspired by stock index. Procedia Engineering, 196, 706–713. https://doi.org/10.1016/j.proeng.2017.07.236 [Google Scholar] [Crossref]
42. Tilley, P. A., & Barton, R. (1997). Design and documentation deficiency: Causes and effects. In Proceedings of the First International Conference on Construction Process Re-engineering (pp. 703–712). Gold Coast, Queensland, Australia. [Google Scholar] [Crossref]
Metrics
Views & Downloads
Similar Articles
- The Indirect Effect of Liquidity and Activity on Company Value with Profitability as an Intervening Variable
- Effect of Financial Skills, Knowledge, and Attitude on The Financial Behaviour of Clergy
- A Decade of Review: Trends in Budget Execution and Financial Performance of Development Projects in Tanzania (2014/15-2023/24)
- The Influence of Pre-Project Planning on the Budget Absorption Rate of Public Funded Infrastructure Projects in Kenya a Comparative Case Study of Narok, Migori, and Kisii County Government Projects
- Assessment of Factors Influencing Digital Transformation in Hotels’ Facility Management in Abuja Metropolis, Nigeria