Overcoming Barriers to Industrialized Building System (IBS) Adoption Through BIM-Enabled Cost Optimization in Malaysian Construction Projects
Authors
Department of Quantity Surveying,Faculty of Built Environment, University Technology MARA (UiTM) (Malaysia)
Noor Akmal Adillah Ismail (Sr, Dr)
Department of Quantity Surveying,Faculty of Built Environment, University Technology MARA (UiTM) (Malaysia)
Wan Mohd Nurdden Wan Muhammad (Sr, Ts)
Department of Quantity Surveying,Faculty of Built Environment, University Technology MARA (UiTM) (Malaysia)
Article Information
DOI: 10.47772/IJRISS.2025.910000529
Subject Category: Management
Volume/Issue: 9/10 | Page No: 6485-6493
Publication Timeline
Submitted: 2025-11-02
Accepted: 2025-11-08
Published: 2025-11-18
Abstract
The integration of Industrialized Building Systems (IBS) and Building Information Modelling (BIM) represents a pivotal advancement in transforming conventional construction practices towards industrialization. Despite the increasing promotion of IBS under Malaysia’s Construction Industry Transformation Programme (CITP 2016–2020), its implementation continues to face challenges arising from fragmented project delivery methods, limited coordination, and poor planning. Concurrently, BIM offers significant capabilities to address these issues through digital collaboration, real-time information management, and design visualization. This paper explores the development of an IBS–BIM integrated framework aimed at enhancing productivity, efficiency, and sustainability in the Malaysian construction industry. A comprehensive literature review was conducted to identify the impacts of IBS–BIM integration, followed by a quantitative survey using structured questionnaires among key industry stakeholders—including architects, engineers, quantity surveyors, and project managers—supplemented by qualitative validation through expert focus group discussions. The findings reveal that the synergy between IBS and BIM mitigates major industry barriers, such as coordination gaps, rework, and design inconsistencies, while fostering collaboration, accuracy, and cost efficiency across project stages.
Keywords
Industrialized Building System (IBS), Building Information Modelling
Downloads
References
1. Abdullah, M. R., Nawi, M. N. M., & Lee, A. (2021). Barriers and challenges of Industrialised Building System (IBS) adoption in Malaysia: A review. Journal of Construction in Developing Countries, 26(2), 101–117. [Google Scholar] [Crossref]
2. AlabdulQader, A., Kaka, A., & Kelly, G. (2013). Building Information Modelling (BIM): Quantitative benefits for construction projects. Automation in Construction, 25, 134–145. [Google Scholar] [Crossref]
3. Al-Ashmori, Y. Y., Othman, I., Rahmawati, Y., & Yahya, K. (2020). The role of BIM in enhancing collaboration and communication in construction projects. International Journal of Built Environment and Sustainability, 7(2), 9–18. [Google Scholar] [Crossref]
4. Amin, A. K., Nawi, M. N. M., & Lee, A. (2017). Cost and financial risk factors affecting Industrialised Building System implementation. Procedia Engineering, 196, 369–376. [Google Scholar] [Crossref]
5. Becerik-Gerber, B., & Rice, S. (2010). The perceived value of Building Information Modelling in the U.S. building industry. Journal of Information Technology in Construction, 15, 185–201. [Google Scholar] [Crossref]
6. CIDB Malaysia. (2015). Construction Industry Transformation Programme (CITP) 2016–2020. Kuala Lumpur: Construction Industry Development Board. [Google Scholar] [Crossref]
7. CIDB Malaysia. (2018). BIM Guide: A guideline to Building Information Modelling implementation in Malaysia. Kuala Lumpur: CIDB. [Google Scholar] [Crossref]
8. Fitri Othman, N., Nawi, M. N. M., & Lee, A. (2017). Fragmentation issues in Malaysian IBS implementation: The need for integrated solutions. Built Environment Journal, 14(2), 12–23. [Google Scholar] [Crossref]
9. Hamzah, N., Khoiry, M. A., Arshad, I., & Kamar, K. A. M. (2016). Integrating Computerized Maintenance Management Systems (CMMS) with BIM for IBS buildings. Journal of Engineering Science and Technology, 11(8), 1121–1137. [Google Scholar] [Crossref]
10. Jabar, I., Ismail, F., & Aziz, A. R. A. (2013). Barriers to IBS adoption in Malaysian construction industry: Challenges for contractors. Procedia – Social and Behavioral Sciences, 74, 360–369. [Google Scholar] [Crossref]
11. Jaganathan, S., Liew, M. S., & Mohammed, A. H. (2017). Framework of IBS-BIM integration for industrialized construction. Journal of Engineering Science and Technology, 12(3), 55–66. [Google Scholar] [Crossref]
12. Linga, N. C. (2015). The role of BIM integration in improving IBS design precision and coordination. Journal of Construction Technology and Management, 2(1), 44–52. [Google Scholar] [Crossref]
13. Mohd Nawi, M. N., Lee, A., & Nor, K. M. (2016). Critical factors in enhancing IBS implementation: Integrating BIM as a coordination tool. Procedia Engineering, 180, 183–192. [Google Scholar] [Crossref]
14. Mydin, M. A. O. (2014). Industrialised Building System in Malaysia: Current state and challenges. International Journal of Sustainable Construction Engineering and Technology, 5(1), 1–9. [Google Scholar] [Crossref]
15. Na Lu, & Korman, T. (2010). Implementation of Building Information Modelling (BIM) in the modular construction industry. Automation in Construction, 19(1), 99–109. [Google Scholar] [Crossref]
16. Shrutiniwas Sharma, S., Kumar, R., & Singh, M. (2017). Integrating BIM with time and cost management: The 4D and 5D revolution. International Journal of Civil Engineering and Technology, 8(8), 234–242. [Google Scholar] [Crossref]
17. Volkan Ezcan, V., Isikdag, U., & Goulding, J. (2013). BIM and prefabrication: Enhancing productivity through digital integration. Journal of Construction Innovation, 13(2), 234–251. [Google Scholar] [Crossref]
18. Woo, X., & Ern, P. A. S. (2021). Benefits and Challenges of Implementing Building Information Technology (BIM) in Industrialized Building System (IBS) Construction Project in Malaysia. Progress in Engineering Application and Technology, 2(2), 151–164. https://publisher.uthm.edu.my/periodicals/index.php/peat/article/view/952 [Google Scholar] [Crossref]
19. Yan, H., & Damian, P. (2008). Benefits and barriers of Building Information Modelling. Proceedings of the 12th International Conference on Computing in Civil and Building Engineering (ICCCBE-XII), Beijing, China. [Google Scholar] [Crossref]
20. Zhang, J., & Gao, Y. (2013). BIM-based approach to improve construction efficiency and reduce project risks. Automation in [Google Scholar] [Crossref]
Metrics
Views & Downloads
Similar Articles
- The Indirect Effect of Liquidity and Activity on Company Value with Profitability as an Intervening Variable
- Effect of Financial Skills, Knowledge, and Attitude on The Financial Behaviour of Clergy
- A Decade of Review: Trends in Budget Execution and Financial Performance of Development Projects in Tanzania (2014/15-2023/24)
- The Influence of Pre-Project Planning on the Budget Absorption Rate of Public Funded Infrastructure Projects in Kenya a Comparative Case Study of Narok, Migori, and Kisii County Government Projects
- Assessment of Factors Influencing Digital Transformation in Hotels’ Facility Management in Abuja Metropolis, Nigeria