Analysing Material Management Approaches and Their Effects on Construction Project Performance in Nigeria (A Study of Akwa Ibom Real Estate Sector)

Authors

Obamoh Samuel Olaolu

Department of Quantity Surveying, Federal Polytechnic, Ukana, Akwa Ibom State (Nigeria)

Obamoh Hannah Yetunde

Department of Architectural Technology, Federal Polytechnic, Ukana, Akwa Ibom State (Nigeria)

Okon Fortune Samuel

Department of Quantity Surveying, Federal Polytechnic, Ukana, Akwa Ibom State (Nigeria)

Usoro Ifiok Boniface

Department of Quantity Surveying, Federal Polytechnic, Ukana, Akwa Ibom State (Nigeria)

Article Information

DOI: 10.51244/IJRSI.2026.130200104

Subject Category: Civil Engineering

Volume/Issue: 13/2 | Page No: 1154-1163

Publication Timeline

Submitted: 2026-02-19

Accepted: 2026-02-24

Published: 2026-03-06

Abstract

The real estate market in Nigeria has seen impressive growth, largely driven by urbanization and improvements in infrastructure, with Akwa Ibom State playing a pivotal role in this development. One of the key elements that can make or break a construction project is effective material management, as it has a direct effect on costs, timelines, and overall quality. This study dives into the material management strategies used in Akwa Ibom's real estate sector and evaluates how well they work in boosting project outcomes. To gather insights, we used a mixed-methods approach that included semi-structured interviews with 20 stakeholders—like project managers, procurement officers, and suppliers—along with a thorough analysis of procurement documents and project performance data. The research uncovered several common strategies, including just-in-time delivery, vendor-managed inventory, and RFID integration, with just-in-time delivery and RFID standing out for their positive effects on project costs, time efficiency, and quality. However, we also found that issues like logistical disruptions, tech limitations, and delays in material deliveries can really throw a wrench in the works. To tackle these challenges, the study suggests adopting advanced technologies like Building Information Modeling (BIM) and RFID, fostering better collaboration among stakeholders, and investing in training programs to enhance material management practices. These insights can be incredibly useful for stakeholders looking to improve construction project performance and add to the growing knowledge on material management in developing economies.

Keywords

Akwa Ibom state, material management, project performance, real estate sector

Downloads

References

1. Akinola, G. O., Oyewole, Y. B., Olaleye, B. R. & Ibrahim, A. (2022). The influence of materials management [Google Scholar] [Crossref]

2. Akintoye, A., Goulding, J., & Lam, K. C. (2020). Construction project management: The impact of material management on performance. Construction Economics and Building, 20(4), 55-66. https://doi.org/10.5130/ajceb.v20i4.7080 [Google Scholar] [Crossref]

3. Albert, I., Shakantu, W. & Ibrahim, S. (2021). The effect of poor materials management in the construction industry: [Google Scholar] [Crossref]

4. Ballard, G. (2000) The Last Planner System of Production Control. Ph.D. Thesis, University of Birmingham, [Google Scholar] [Crossref]

5. Banton, C. (2021). Just-in-Time (JIT): Definition, example, and pros & cons. Investopedia. Retrieved from https://www.investopedia.com/terms/j/jit.asp [Google Scholar] [Crossref]

6. Brutus, I. A., & Chiyem, O. (2020). Assessment of materials management and profitability in the Nigerian construction industry. International Journal of Construction Management, 27(5), 345-359. https://doi.org/10.1080/15623599.2020.1775150 [Google Scholar] [Crossref]

7. Birmingham, UK, 2000. Available at: https://www.researchgate.net/publication/239062242_ at: https://www.researchgate.net/publication/228960283_ [Google Scholar] [Crossref]

8. Banton, C. (2024). Just-in-Time (JIT): Definition, Example, and Pros & Cons. Available at: https://www.investopedia.com/terms/j/jit.asp [Google Scholar] [Crossref]

9. Boom and Bucket, (2023). Optimizing Material Management on Construction Sites. Available at:https://www.boomandbucket.com/blog/optimizing-material-management-on-construction-sites [Google Scholar] [Crossref]

10. Clough, R.H., Sears, G.A. & Sears, S.K. (2000). Construction project management. New York: John Wiley and Sons. Available at: https:// books.google.com/books?hl=en&lr=&id= 56ZUMHjdicgC&oi =fnd&pg=PP11&ots=94Kv3os3hB&sig=iwYZHttqvP4FS9D8CNnPdpH0Gr4 Justification [Google Scholar] [Crossref]

11. Erlangga, S., Yunita, A. & Satriana, S. (2022). Development of Automatic Real Time Inventory Monitoring System using RFID Technology in Warehouse. JOIV: International Journal on Informatics Visualization. 6. 636. Available at: http://dx.doi.org/10.30630/joiv.6.3.1231 [Google Scholar] [Crossref]

12. Gurmu, A. (2018). Construction materials management practices enhancing labour productivity in multi-storey building. [Google Scholar] [Crossref]

13. Hermans, V., Preter, G. & Verschueren, T. (2012). Training in manual material handling: What is going on in the field?. Work. 41. 588-591. Available at: https://doi.org/10.3233/WOR-2012-0214-588 [Google Scholar] [Crossref]

14. Ibrahim, U. & Daniel, C. (2019). Impact of Materials Management on Project Success in Construction Industry. [Google Scholar] [Crossref]

15. Koskela, L. (2021). Application of the new production philosophy to construction. Technical Report, CIFE: Stanford University. Retrieved from https://www.researchgate.net/publication/220299134 Application_of_the_New_Production_Philosophy_to_Construction [Google Scholar] [Crossref]

16. Liker, J. K. (2022). The Toyota Way: 14 Management Principles from the World’s Greatest Manufacturer (2nd ed.). McGraw-Hill Education.Available at: https://arabianjbmr.com/pdfs/JPDS_VOL_9_3/11.pdf [Google Scholar] [Crossref]

17. Moon, S., Xu, S., Hou, L., Wu, C., Wang, X., & Tam, V. (2021). RFID-aided tracking system to improve work efficiency of scaffold suppliers: Stock management in Australasian supply chain. Journal of Construction Engineering and Management, 144(12), 05018011. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001432 [Google Scholar] [Crossref]

18. Ogunba, A. O., Fatoye, O. O., & Adebayo, A. O. (2020). Challenges and solutions in the material management process for construction projects in Nigeria. International Journal of Construction Management, 22(2), 120-135. https://doi.org/10.1080/15623599.2020.1788957 [Google Scholar] [Crossref]

19. Sogaxa, A. (2022). Efficient material management strategies for enhancing the performance of SMEs in the South African construction industry. International Journal of Construction Supply Chain Management, 12(1), 1-10. https://doi.org/10.31487/j.ijcscm.2022.01.03 [Google Scholar] [Crossref]

20. European Journal of Business and Management, 11(17). Available at: http://dx.doi.org/10.7176/EJBM/11-17-01 [Google Scholar] [Crossref]

21. Kaur, A. (2016). Materials Management. 1. Available at: https://www.researchgate.net/publication/344302431 [Google Scholar] [Crossref]

22. Khaled, F. J. (2019). The Impact of Poor Planning and Management on the Duration of Construction Projects: A Review. Available at: https://www.researchgate.net/publication/333973330_ [Google Scholar] [Crossref]

23. Kuebutornye, N., Eugene, A. S., Joseph, A. A. & Asigri, T. M. (2018). Effects of material management techniques on construction project success: Perspective of material managers in northern region of Ghana. International Journal of Scientific & Technology Research, 7(5), 183-188. [Google Scholar] [Crossref]

24. Liker, J. K. (2004). Toyota Way: 14 Management Principles from the World's Greatest Manufacturer. 1st ed. NewYork: McGraw-Hill Education. Available at: https://www.accessengineeringlibrary.com/content/book/9780071392310 [Accessed: 28 March 2024]. [Google Scholar] [Crossref]

25. Mat Jusoh, Z. & Kasim, Narimah. (2017). A Review on Implication of Material Management to Project Performance. MATEC Web of Conferences. 87. 01012. Available at: https://doi.org/10.1051/matecconf/20178701012 [Google Scholar] [Crossref]

26. Moon, Sungkon & Xu, Shouzhi & Hou, Lei & Wu, Changzhi & Wang, Xiangyu & Tam, Vivian. (2018). RFID Aided Tracking system to improve work efficiency of scaffold supplier: Stock Management in Australasian Supply Chain. Journal of Construction Engineering and Management. 144. Available at: http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0001432 [Google Scholar] [Crossref]

27. Opportunities and Challenges. Available at: http://dx.doi.org/10.32674/jcihe.v14i4.3874 [Google Scholar] [Crossref]

28. Ozturk, Z. L. (2020). Inventory Management in Supply Chains. Available at: https://www.researchgate.net/publication/356085653 [Google Scholar] [Crossref]

29. Poudel, A. P. (2022). Information and Communication Technology in English Language Teaching: Some [Google Scholar] [Crossref]

30. Prayuda, H., Monika, F., Cahyati, M. D., Hermansyah, Afriandini, B. & Budiman, D. (2020). Critical Review on Development of Lean Construction in Indonesia. In Proceedings of the 4th International Conference on Sustainable Innovation 2020–Technology, Engineering and Agriculture (ICoSITEA 2020) (Vol. 199, Advances in Engineering Research). Atlantis Press. Available at: https://www.atlantis-press.com/article/125952564.pdf [Google Scholar] [Crossref]

31. Prieto, R. (2021). Materials Management. Available at: https://www.researchgate.net/publication/352983289_ [Google Scholar] [Crossref]

32. Sogaxa, A. (2022). Efficient material management strategies for enhancing the performance of SMEs in the South African construction industry. International Journal of Construction Supply Chain Management Volume 12 Number 1, 2022. Available at: https://ijcscm.com/menu-script/index.php/ijcscm/article/download/121/98[Accessed: 03 March]. [Google Scholar] [Crossref]

33. Tunji-Olayeni, P., Adedeji, A., Ojelabi, R. & Ayim, B.A. (2017). Impact of logistics factors on material procurement for construction projects. International Journal of Civil Engineering and Technology. 8. 1142-1148. [Google Scholar] [Crossref]

34. Vatsal, P. & Pitroda, J. (2017). A critical literature review on the impact of material management on construction project delivery. 5. 1829-1836. Available at: https://www.researchgate.net/publication/354339749 [Google Scholar] [Crossref]

35. Zulkifli, C., Malek, S., Nor, N., & Jaffer, S. (2021). The development of material flow architecture using RFID technology in real industrial environments. Journal Teknologi, 78(6), 1-8. https://doi.org/10.11113/jt.v78.5425 [Google Scholar] [Crossref]

Metrics

Views & Downloads

Similar Articles