Evaluating the Effectiveness of Earned Value Management in Construction Project Control in FCT Abuja
Authors
Institute of Built Environment, Nasarawa State University, Keffi, PMB 1022. (Nigeria)
Institute of Built Environment, Nasarawa State University, Keffi, PMB 1022. (Nigeria)
Institute of Built Environment, Nasarawa State University, Keffi, PMB 1022. (Nigeria)
Article Information
DOI: 10.47772/IJRISS.2026.100500816
Subject Category: Construction
Volume/Issue: 10/5 | Page No: 12039-12049
Publication Timeline
Submitted: 2026-05-11
Accepted: 2026-05-16
Published: 2026-06-15
Abstract
This study examines the impact of Earned Value Management (EVM) on cost, schedule, and scope performance in construction projects within the Federal Capital Territory (FCT), Abuja. A quantitative approach was adopted using a structured questionnaire administered to 108 construction professionals, of which 95 valid responses (88.0%) were analysed. Descriptive statistics, including mean scores and standard deviations, were utilized to assess EVM effectiveness and identify implementation challenges. The results show that EVM significantly improves project cost management, with mean scores ranging from 4.09 to 4.18, indicating strong agreement on its ability to track costs, detect overruns early, and enhance financial transparency. Similarly, EVM positively influences schedule and scope management, with mean values between 4.04 and 4.18, reflecting improved progress monitoring, early identification of schedule delays, and clearer scope definition. In terms of overall project performance, mean scores ranged from 3.87 to 4.02, indicating a moderate-to-strong positive impact. EVM also enhances managerial decision-making, with a mean score of 4.04 for providing accurate data for decisions. However, key challenges such as inadequate training (mean = 4.00), limited management support (mean = 4.00), and poor technological infrastructure (mean = 4.04) hinder effective adoption. The study concludes that while EVM is highly effective, its success depends on improved capacity building and organizational support.
Keywords
Earned Value Management, cost control, schedule management, project performance, construction projects.
Downloads
References
1. Aibinu, A. A., & Jagboro, G. O. (2002). The effects of construction delays on project delivery in Nigerian construction industry. International Journal of Project Management, 20(8), 593–599. [Google Scholar] [Crossref]
2. Albert, I., Bilau, A. A., Osadola, A. O., Baiyegunhi, C. M., & Obaju, B. N. (2025). Barriers to the institutionalisation of earned value management in Nigerian construction project. COOU African Journal of Environmental Research. [Google Scholar] [Crossref]
3. Almeida, R., Abrantes, R., Romão, M., & Proença, I. (2021). The impact of uncertainty in the measurement of progress in earned value analysis. Procedia Computer Science. [Google Scholar] [Crossref]
4. Anbari, F. T. (2003). Earned value project management method and extensions. Project Management Journal, 34(4), 12–23. [Google Scholar] [Crossref]
5. Aramali, V., Gibson, G. E., El Asmar, M., & Cho, N. (2021). Earned value management system state of practice: Identifying critical subprocesses, challenges, and environment factors of a high-performing EVMS. Journal of Management in Engineering, 37(4), 04021025. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000925 [Google Scholar] [Crossref]
6. Aramali, V., Sanboskani, H., Gibson, G. E., & El Asmar, M. (2022). EVMS maturity and its impact on project cost and schedule performance of large and complex projects: A preliminary analysis. In Construction Research Congress 2022: Project Management and Delivery, Controls, and Design and Materials. [Google Scholar] [Crossref]
7. Attarzadeh, I., & Hock, O. S. (2009). A new forecasting model to improve earned value index to achieve an accurate project time and cost estimation. In Proceedings of the 2009 International Conference on Information Management and Engineering (ICIME 2009). [Google Scholar] [Crossref]
8. Beck, P. J., & Kovacs, D. (2018). Earned schedule and the use of schedule execution reporting metrics. In Proceedings of the Biennial International Pipeline Conference (IPC). [Google Scholar] [Crossref]
9. De Marco, A., Rosso, M., & Narbaev, T. (2016). Nonlinear cost estimates at completion adjusted with risk contingency. Journal of Modern Project Management. [Google Scholar] [Crossref]
10. Fleming, Q. W., & Koppelman, J. M. (2016). Earned value project management (4th ed.). Project Management Institute. [Google Scholar] [Crossref]
11. Hunter, H., Fitzgerald, R., & Barlow, D. (2014). Improved cost monitoring and control through the Earned Value Management System. Acta Astronautica. [Google Scholar] [Crossref]
12. Kamyabniya, A., & Bagherpour, M. (2014). Risk-based earned value management: A novel perspective in software engineering. International Journal of Industrial and Systems Engineering. [Google Scholar] [Crossref]
13. Kerzner, H. (2017). Project management: A systems approach to planning, scheduling, and controlling (12th ed.). Wiley. [Google Scholar] [Crossref]
14. Oladipo, O. A. (2007). Project management practice in the Nigerian construction industry. Journal of Construction Management and Economics, 25(2), 121–129. [Google Scholar] [Crossref]
15. Pajares, J., & López-Paredes, A. (2011). An extension of the EVM analysis for project monitoring: The Cost Control Index and the Schedule Control Index. International Journal of Project Management. [Google Scholar] [Crossref]
16. Priyo, M. (2021). Earned value management system in Indonesian construction projects. International Journal of Integrated Engineering, 13(3), 37–45. https://doi.org/10.30880/ijie.2021.13.03.005 [Google Scholar] [Crossref]
17. Rodriguez Blanco, F. J. (2011). Revenue recognition methods and cost control through earned value management (EVM). AACE International Transactions. [Google Scholar] [Crossref]
18. Vanhoucke, M. (2014). Integrated project management and control: First comes the theory, then the practice. Springer. [Google Scholar] [Crossref]
Metrics
Views & Downloads
Similar Articles
- Various Materials that can Be Harnessed from Different Package Parcels to Be Used as Support Additives
- Barriers to the Domestication and Implementation of the Nigerian National Building Code in Yobe State
- Interim Payment Challenges in the Construction Industry: A Systematic Review
- "Developing A Framework to Enhance Soft Skill Competency of Construction Managers for Successful Project Delivery"
- The Influence of Technology-Driven Construction Management Practices on Sustainable Building Performance