The Partnership Agreement between Banda Aceh Municipality and Private Parties

Submission Deadline-30th July 2024
June 2024 Issue : Publication Fee: 30$ USD Submit Now
Submission Deadline-20th July 2024
Special Issue of Education: Publication Fee: 30$ USD Submit Now

International Journal of Research and Innovation in Social Science (IJRISS) | Volume V, Issue II, February 2021 | ISSN 2454–6186

The Partnership Agreement between Banda Aceh Municipality and Private Parties

Irwansyah1, Tan Kamello2, Ilyas Ismail3, Azhari Yahya4
1PhD Student at Faculty of Law, Syiah Kuala University Aceh-Indonesia
2Professor at Faculty of Law, University of North Sumatera, Medan-Indonesia;
3Profesor at Faculty of Law, Syiah Kuala University, Banda Aceh-Indonesia;
4Lecturer at Faculty of Law, Syiah Kuala University, Banda Aceh-Indonesia

IJRISS Call for paper

Abstract: Public Private Partnership (PPP) as a concept must be able to face the new era of disruption caused by the Fourth Industrial Revolution (4IR). For this reason, it is necessary to re-examine and renew the legal and economic paradigm. Public Private Partnership (PPP) is an effort to improve the community’s economy, such as infrastructure development. Infrastructure development need very large budget, so it requires cooperation with the private sector. The Build Operate and Transfer (BOT) contract collaboration is a new project financing model that is not only benefits the contracted parties, but have benefits the public interest also. The purpose of this study is to determine the increase in Indonesia’s readiness to participate in 4IR and the impact of the Build Operate and Transfer (BOT) cooperation agreement on infrastructure development in the Aceh region. The research method used is juridical normative by using secondary data as the main data in the form of a Build Operate and Transfer (BOT) contract, as well as empirical data issued by the World Economic Forum (Global Competitiveness 2018) to measure readiness in facing 4IR. The results of this study showed overall the method of measuring Indonesia’s readiness to participate in 4IR has increased, with the ratio of the country increasing from 47 to 45 while for the institutional pillar, the capacity of the legal and regulatory framework has increased from 40 to 37. BOT contract between the government and the private sector in large-scale infrastructure development have a positive impact on society. The conclusion of this research is optimistically that the Indonesian state is ready to participate in the 4th Industrial Revolution and there is no need for a legal vacuum to transplant legal movements, but still reconceptualize the Public Private Partnership (PPP) with the Build Operate and Transfer (BOT) Contract to pursue the effectiveness of the law framework.

Keywords: Partnership Agreement– Banda Aceh Municipality Private Parties

I. INTRODUCTION

Since the last decade, some technologies have affected our lives. Every new innovation and technology that will come will changes in society, like attitude, way of life, way of thinking, and et cetera. Between the major changes that are important in human society is the way humans interact with each other, and now involves technology which was previously unknown [1].