Workforce Skill Challenges in IBS Project Implementation in Rural Area Sabah & Sarawak: A Systematic Analysis
Authors
UNITAR International University (Malaysia)
Article Information
DOI: 10.51584/IJRIAS.2025.10120041
Subject Category: Management
Volume/Issue: 10/12 | Page No: 531-559
Publication Timeline
Submitted: 2026-01-02
Accepted: 2026-01-09
Published: 2026-01-15
Abstract
The paper aimed to evaluate workforce skill deficiencies, benchmark project management challenges causing delays, identify organizational and logistical factors influencing IBS adoption, deconstruct management-delay relationships, and compare mitigation strategies in rural Malaysian Borneo contexts. A systematic analysis of qualitative and quantitative studies focusing on rural Sabah and Sarawak was conducted, emphasizing workforce competency, management practices, and delay factors. Findings reveal pervasive local workforce skill gaps, including limited technical knowledge and motivation, compounded by reliance on foreign labour and insufficient training programs. Management challenges such as poor communication, fragmented teams, inadequate supervision, and contract issues significantly contribute to project delays. Logistical constraints, including limited local manufacturing and infrastructure deficits, exacerbate delays and increase costs. Organizational support mechanisms, notably government incentives, training initiatives, and readiness frameworks, are critical yet underutilized in rural settings. Integrating these findings highlights the multifactorial nature of IBS implementation delays, underscoring the need for integrated workforce development and management competency enhancement tailored to rural contexts. The finding informs theoretical frameworks and practical interventions aimed at improving IBS project delivery and reducing delays in Sabah and Sarawak’s rural construction sectors.
Keywords
Workforce skill, Industrial Building System (IBS), rural Sabah
Downloads
References
1. Abdullah, W. R., & Nasir, S. R. (2024). Improvement Action Model for Human Factors in Supply Chain for Industrial Building System Projects. SpringerBriefs in Applied Sciences and Technology. Retrieved from https://doi.org/10.1007/978-3-031-55948-8_15 [Google Scholar] [Crossref]
2. Alaghbari, W., A. Kadir, M., Salim, A., & Ernawati. (2007). The significant factors causing delay of building construction projects in Malaysia. Engineering Construction & Architectural Management, 192 - 206. doi:10.1108/09699980710731308 [Google Scholar] [Crossref]
3. Al-Aidrous, A.-H. M., Shafiq, N., Al-Ashmori, Y. Y., Al-Mekhlafi, A.-B. A., & Baarimah, A. O. (2022). Essential Factors Enhancing Industrialized Building Implementation in Malaysian Residential Projects. Retrieved from https://doi.org/10.3390/su1418117 [Google Scholar] [Crossref]
4. Alawag, A. M., Alaloul, W. S., Baarimah, A. O., Musarat, M. A., & Al-Mekhlafi, A.-B. A. (2023). The Role of the Total-Quality-Management (TQM) Drivers in Overcoming the Challenges of Implementing TQM in Industrialized-Building-System (IBS) Projects in Malaysia: Experts’ Perspectives. Sustainability 2023. Retrieved from https://doi.org/10.3390/su15086607 [Google Scholar] [Crossref]
5. Alawag, A. M., Alaloul, W. S., Liew, M. S., AL-Ashmori, A. M., Alqadami, A. T., & Ammad, S. (2022). Application of Industrialised Building System in the Field of Construction toward Sustainability: Future Routes and a Theoretical Mapping. doi:https://doi.org/10.1109/3ICT56508.2022.9990879 [Google Scholar] [Crossref]
6. Alawag, A. M., Alaloul, W. S., Liew, M. S., Al-Bared, M. A., M., Z., N. A. W. A., & Ammad, S. (2021). The Implementation of the Industrialized Building System in the Malaysian Construction Industry—a Comprehensive Review. Retrieved from https://doi.org/10.1007/978- [Google Scholar] [Crossref]
7. Alawag, A. M., Alaloul, W. S., Liew, M. S., Musarat, M. A., & Baarimah, A. O. (2023b). Implementation of total quality management (TQM) in malaysian industrialized building system (IBS) projects. Revista De La Construccion. Retrieved from https://doi.org/10.7764/rdlc.22.1.74 [Google Scholar] [Crossref]
8. Ali, M. M., Abas, N. H., Affandi, H. M., & Abas, N. A. (2018). Factors impeding the industrialized building system (IBS) implementation of building construction in Malaysia. International Journal of Engineering and Technology. Retrieved from https://doi.org/10.14419/IJE [Google Scholar] [Crossref]
9. Alia, A., Bohari, M., & Kipli, K. (2011). Alia, A., Bohari, M., & Kipli, K. (2011).Contractor’s Knowledge on Industrial Building System (IBS) in Sarawak. ASEAN Conference on Scientific and Social Science Research 2011. Penang, Malaysia. [Google Scholar] [Crossref]
10. Amin, M. A., Abas, N. H., Shahidan, S., Rahmat, M. H., Suhaini, N. A., Nagapan, S., & & Rahim, R. A. (2017). A review on the current issues and barriers of Industrialised Building System (IBS) adoption in Malaysia’s construction industry. doi:https://doi.org/10.1088/1757-899X/271/1/012031 [Google Scholar] [Crossref]
11. Baharuddin, M. N., Bahardin, N. F., Zaidi, M. A., Lokman, I., & Nawi, M. N. (2016). An exploratory review on critical factors of IBS formwork implementation for Malaysian construction stakeholders. Retrieved from https://doi.org/10.1063/1.4960863 [Google Scholar] [Crossref]
12. Bohari, A. A., Mahat, N., & Kipli, K. (2012). Industrialised Building System (IBS) in Sarawak construction industry. International Conference on Innovation Management and Technology Research. Retrieved from https://doi.org/10.1109/ICIMTR.2012.6236433 [Google Scholar] [Crossref]
13. Delfani, M., & Ibrahim, R. (2021). Essential Features of Design Process for Professionals Participating in IBS Projects in Malaysia. Resilient and Responsible Smart Cities. Advances in Science, Technology & Innovation, 121–129. Retrieved from https://doi.org/10.1007/978-3-030-63567-1_11 [Google Scholar] [Crossref]
14. Flora, A. (2022). Industrialised building system workmanship performance in Malaysia https://doi.org/10.1063/5.0094101. Nucleation and Atmospheric Aerosols. Retrieved from https://doi.org/10.1063/5.0094101 [Google Scholar] [Crossref]
15. Hadi, N. A., Muhamad, W. M., & Othman, M. K. (2017). Critical factors of implementing Industrialised Building System in Sarawak: A research on SMEs. Retrieved from https://doi.org/10.1088/1755-1315/67/1/012006 [Google Scholar] [Crossref]
16. Hashim, M. Z., Muntath, F. S., Othman, I., & Musa, M. K. (2024). Evaluating the Effectiveness of Industrialized Building Systems (IBS) in Reducing Construction Waste in Kuching, Sarawak. International Journal of Academic Research in Business & Social Sciences. Retrieved from https://doi.org/10.6007/ijarbss/v14-i9/22795 [Google Scholar] [Crossref]
17. Hobees, M. A., Riazi, S. R., Ismail, R., Yusuf, A. A., Nawi, M. N., & Omar, M. F. (2021). Facilities Management (FM) in Industrialized Building System (IBS) Projects in Malaysia: Challenges and Strategies for Improvement. doi:https://doi.org/10.14704/WEB/V18SI03/WEB18016 [Google Scholar] [Crossref]
18. Ismail, F., Aziz, A. R., & Aziz, N. M. (2014). Industrialized Building System Projects: A Survey of Construction Project Manager’s Competencies in Malaysia. Australian Journal of Basic and Applied Sciences, 8(2), 294-300. Retrieved from https://www.academia.edu/66834189/Industrialized_Building_System_Projects_A_Survey_of_Construction_Project_Managers_Competencies_in_Malaysia [Google Scholar] [Crossref]
19. Jabar, I. l., & Ismail, F. (2018). Challenges in the Management of IBS Construction Projects. Asian Journal of Quality of Life, 3(9), 37–46. Retrieved from https://doi.org/10.21834/AJQOL.V3I9.75 [Google Scholar] [Crossref]
20. Jabar, I. l., Ismail, F., & Aziz, N. M. (2018). Managing IBS Project: The evolving roles and competencies of project manager. Asian Journal of Behavioural Studies, 3(11), 117-125. Retrieved from https://doi.org/10.21834/ajbes.v3i11.107 [Google Scholar] [Crossref]
21. Jabar, I. l., Ismail, F., Aziz, N. M., & Janipha, N. A. (2013). Challenges in the Management of IBS Construction Process of IBS Projects. [Google Scholar] [Crossref]
22. Jaffar, Y., & Lee, C. K. (2020). Factors Influencing Industrialized Building System (IBS) Project Performance: A Systematic Review. Retrieved from https://doi.org/10.15282/JGI.3.2.2020.5311 [Google Scholar] [Crossref]
23. Jalil, A. B., & Shaari, S. M. (2022a). Exploring the Hurdles and Solutions in Procuring IBS Components for Malaysian Housing Projects. IOP Conference Series. Retrieved from https://doi.org/10.1088/1755-1315/1067/1/012062 [Google Scholar] [Crossref]
24. Jalil, A. B., & Shaari, S. M. (2022b). Installation IBS Components in Malaysian Housing Projects; The Difficulties and Solutions. Retrieved from https://doi.org/10.1088/1755-1315/1067/1/012063 [Google Scholar] [Crossref]
25. Kamar, K. A., Alshawi, M., & Hamid, Z. (2012). Industrialised Building System: The Critical Success Factors. Retrieved from https://www.irbnet.de/daten/iconda/CIB_DC29275.pdf [Google Scholar] [Crossref]
26. Kamar, K. M. (2011). Critical success factors to industrialised building system (IBS) contractor. [Google Scholar] [Crossref]
27. Kaur, S., Abas, N. H., Hasmori, M. F., Ta’at, N. H., Amin, S. M., Sabtu, H., & Abbasi, S. A. (2024). Stakeholders’ Perception on the Current Practices of Industrial Building System (IBS) Construction Technology. Journal of Advanced Research in Applied Sciences and Engineering Technology. Retrieved from https://doi.org/10.37934/araset.44.2.199209 [Google Scholar] [Crossref]
28. Khor, S. C., Tiang, W.-Y., Abdullatef, O. A., & Wai, S. H. (2023). Evaluate Workforce Perspective in Industrialised Building System. Asian Journal of Environment-Behaviour Studies. Retrieved from . https://doi.org/10.21834/aje-bs.v8i24.420 [Google Scholar] [Crossref]
29. Khor, S.-C., Tiang, W.-Y., Abdullatef, O. A., & Wai, S.-H. (2021). Appraisal on Workforce Performance towards Industrialised Building System in Perak, Malaysia. Environment-Behaviour Proceedings Journal, 6(18), 49–53. Retrieved from https://doi.org/10.21834/ebpj.v6i [Google Scholar] [Crossref]
30. Khor, S.-C., Tiang, W.-Y., Abdullatef, O. A., & Wai, S.-H. (2021). Appraisal on Workforce Performance towards Industrialised Building System in Perak, Malaysia.6(18) . Environment-Behaviour Proceedings Journal, 6(18), 49-53. Retrieved from https://doi.org/10.21834/ebpj.v6i [Google Scholar] [Crossref]
31. Lee, Y. Y., Abdullah, N. M., Q., L. Y., Gui, H. C., & Whyte, A. (2021). Perception Analysis of Industrialized Building System (IBS) Implementation for G7 Contractors in Kuching, Sarawak. Retrieved from https://doi.org/10.32802/ASMSCJ.2020.641 [Google Scholar] [Crossref]
32. Masram, H., Yassin, A. M., Shafii, H., & Murugappah, P. (2024). Challenges in the Implementation of Industrialised Building System (IBS) in Klang Valley. MATEC Web of Conferences. Retrieved from https://doi.org/10.1051/matecconf/202439701001 [Google Scholar] [Crossref]
33. Mohamad, M. I., Zawawi, M., & Nekooie, M. A. (2018). Implementing industrialised building system (ibs) in malaysia: acceptance and awareness level, problems and strategies. doi:https://doi.org/10.11113/mjce.v21.15784 [Google Scholar] [Crossref]
34. Mohammed, A. (2016). Enhancing skill worker requirements in improving implementation of IBS in construction projects. Retrieved from https://www.semanticscholar.org/paper/Enhancing-skill-worker-requirements-in-improving-of-Mohammed/40109adb60fa120ed2ace6b573353099920a4be2 [Google Scholar] [Crossref]
35. Mohsen, A., Yunus, R., Handan, R., Kasim, N., & Hussain, K. (2019). Determining factors for enhanced skilled worker requirements in IBS construction projects in Malaysia. IOP Conference Series: Earth and Environmental Science. Retrieved from https://doi.org/10.1088/1755-1315/220/1/012048 [Google Scholar] [Crossref]
36. Nasir, N. M., Nawi, M. N., Rahim, M. K., Bahaudin, A. Y., & Tapa, A. (2015). A review of delay factors in Malaysian Industrialized Building System (IBS) construction project. [Google Scholar] [Crossref]
37. Nawi, M. N., Azman, M. N., Osman, W. N., Radzuan, K., & Yaakob, M. (2017). Key success factors for team integration practice in Malaysian industrialised building system (IBS) construction industry. GEOGRAFIA OnlineTM Malaysian Journal of Society and Space, 88-94. Retrieved from https://journalarticle.ukm.my/9898/1/9x.geografia-si-mac16-nasrun-edam.pdf [Google Scholar] [Crossref]
38. Rakan K. Albalawi, Paul M. Goodrum, & Taylor, T. R. (2023). Applying the Tier II Construction Management Strategy to Measure the Competency Level among Single and Multiskilled Craft Professionals.Buildings. Buildings 2023, 5, 1175. Retrieved from https://doi.org/10.3390/buildings13051175 [Google Scholar] [Crossref]
39. Razak, M. I., Khoiry, M. A., Badaruzzaman, W. H., Hussain, A. H., & Zain, M. Z. (2023). Development of Application Framework for Design for Manufacturing and Assembly Towards Digital and Sustainable Construction in Malaysia. Jurnal Kejuruteraan. doi:10.17576/jkukm-2023-35(2)-06 [Google Scholar] [Crossref]
40. Saberi, M. H., Zulkifli, N. D., Zainuddin, M. F., & Saidin, M. T. (2022). Constraints in Implementation of Industrialised Building System (IBS) Project: Contractors’ Perspective. International Journal of Academic Research in Business and Social Sciences, 1719-1726. Retrieved from http://dx.doi.org/10.6007/IJARBSS/v12-i8/14487 [Google Scholar] [Crossref]
41. Salahuddin, S. N. (2010). Factors influence construction time performance for IBS in Malaysia Construction Industry. [Google Scholar] [Crossref]
42. Samsi, M. S., Zainuddin, M. F., Zain, F. M., Saidin, M. T., Mamat, M. E., & Abidin, Z. Z. (2024). The readiness and challenges in the industrialised building system (ibs) adoption in sarawak from g7 contractors’ perspective. Malaysian Journal of Sustainable Environment. Retrieved from https://doi.org/10.24191/myse.v11i1.985 [Google Scholar] [Crossref]
43. Shafie, M. S. (2020). Challenges or constraints in the implementation of industrialised building system for projects under Jabatan Kerja Raya Negeri Perak. Retrieved from http://eprints.utm.my/id/eprint/86056/1/MuhammadShazniShafieMSKA2020.pdf [Google Scholar] [Crossref]
44. Soo-Cheen, K., Wai-Yew, T., Abdullatef, O. A., & Soon-Han, W. (2021). Appraisal on Workforce Performance Towards Industrialised Building System in Perak, Malaysia. Environment-Behaviour Proceedings Journal, 6(18), 49-53. Retrieved from https://doi.org/10.21834/ebpj.v6i18.3066 [Google Scholar] [Crossref]
45. Tamrin, N., Nawi, M. N., & Nifa, F. A. (2015). Industrialised building system in construction projects: a study on readiness. [Google Scholar] [Crossref]
46. Tamrin, N., Nawi, M. N., & Nifa, F. A. (2016). Key factors of readiness in the implementation of industrialised building system (IBS). Retrieved from https://doi.org/10.1063/1.4960943 [Google Scholar] [Crossref]
47. Tarang, V. A., Mohammad, M. F., Nizam Akbar, A. R., & Mohamed, M. R. (2025). Pertinent Internal and External Issues in Industrialised Building System (IBS) Construction Business in Malaysia. Retrieved from http. Built Environment Journal, 19(1). Retrieved from https://journal.uitm.edu.my/ojs/index.php/BEJ/article/view/7557 [Google Scholar] [Crossref]
48. Wan Ahmad, W. B. (2025). Analysis of Delay Factors in Rural Development Projects Utilizing the Industrialized Building System (IBS) in Malaysia: A Review. International Journal For Multidisciplinary Research, 7(5). Retrieved from https://doi.org/10.36948/ijfmr.2025.v07i05.58415 [Google Scholar] [Crossref]
49. Wan Ahmad, W. B. (2025). Bridging the Divide: An Analysis of Community-Led Approaches in Sabah Sarawak, Malaysia Rural Infrastructure Development. International Journal of Latest Technology in Engineering Management & Applied Science, 14(12), 212-235. doi:10.51583/IJLTEMAS.2025.1411000022 [Google Scholar] [Crossref]
50. Wan Ahmad, W. B. (2025). The Impact of School Infrastructure on Student Academic Performance in Sarawak, Malaysia: A Review. International Journal of Research and Scientific Innovation (IJRSI), 12(10). Retrieved from https://doi.org/10.51244/IJRSI.2025.1210000230 [Google Scholar] [Crossref]
51. Wong, S. S., & Lau, L. K. (2015). Advantages and Setbacks of Industrialized Building System (IBS) Implementation: A Case Study in Sarawak. International Journal of Sustainable Construction Engineering and Technology. [Google Scholar] [Crossref]
52. Yusof, M. R., Jabar, I. l., Nawawi, A. H., & Nawi, M. N. (2024). A Review of Current Issues in Industrialised Building System (IBS) for Construction Projects. Built Environment Journal. Retrieved from https://doi.org/10.24191/bej.v21i1.503 [Google Scholar] [Crossref]
Metrics
Views & Downloads
Similar Articles
- The Indirect Effect of Liquidity and Activity on Company Value with Profitability as an Intervening Variable
- Effect of Financial Skills, Knowledge, and Attitude on The Financial Behaviour of Clergy
- A Decade of Review: Trends in Budget Execution and Financial Performance of Development Projects in Tanzania (2014/15-2023/24)
- The Influence of Pre-Project Planning on the Budget Absorption Rate of Public Funded Infrastructure Projects in Kenya a Comparative Case Study of Narok, Migori, and Kisii County Government Projects
- Assessment of Factors Influencing Digital Transformation in Hotels’ Facility Management in Abuja Metropolis, Nigeria