Success Factors for Implementing Cloud-Based Construction Management Software (CBCMS) in Malaysia’s Construction Projects

Authors

Darshinii A. Sivasanmugam

Department of Civil Engineering Technology, Faculty of Engineering Technology, Universiti Tun Hussein Onn Malaysia, Pagoh, Johor (Malaysia)

Siti Nurul Izzah Mohd Sah Roni

Department of Civil Engineering Technology, Faculty of Engineering Technology, Universiti Tun Hussein Onn Malaysia, Pagoh, Johor (Malaysia)

Mohd Kamaruzaman Musa

Department of Civil Engineering Technology, Faculty of Engineering Technology, Universiti Tun Hussein Onn Malaysia, Pagoh, Johor (Malaysia)

Rashidah Lip

Department of Mathematics, Science and Computer, Politeknik Tun Syed Nasir Syed Ismail, Kementerian Pengajian Tinggi, Pagoh, Johor (Malaysia)

Ragil Purnamasari

Department of Civil Infrastructure Engineering, Faculty of Vocation, Institut Teknologi Sepuluh Nopember, Surabaya (Malaysia)

Md Fadli Abdullah

FA Consult, Kempas, Johor Bahru, Johor (Malaysia)

Article Information

DOI: 10.47772/IJRISS.2026.101000750

Subject Category: Civil Engineering

Volume/Issue: 10/10 | Page No: 10549-10563

Publication Timeline

Submitted: 2026-10-26

Accepted: 2026-10-31

Published: 2026-11-17

Abstract

Cloud-Based Construction Management Software (CBCMS) supports construction project management through centralised data management, real-time collaboration and improved project transparency. This study aimed to identify the key success factors for CBCMS implementation in Malaysian construction projects and to evaluate practitioners' perceptions of the importance of these factors for effective implementation. A quantitative cross-sectional survey was conducted using a structured questionnaire comprising 30 five-point Likert-scale items across six literature-derived criteria. The instrument was content-validated by three academic experts and pilot-tested with 30 respondents. Empirical responses from 130 practitioners, purposively sampled from G7 contractor companies registered with the Construction Industry Development Board (CIDB) Malaysia, were analysed using mean scores, Relative Importance Index (RII), item-rest correlations, Cronbach's alpha, Repeated-Measures ANOVA, Exploratory Factor Analysis (EFA), Confirmatory Factor Analysis (CFA) and multiple linear regression in Jamovi. All six criteria exhibited high internal consistency (α = 0.896–0.916) and high levels of practitioner agreement (means = 4.26–4.32; RII = 0.851–0.865). Functionality was ranked highest (mean = 4.32, RII = 0.865), with integration with Building Information Modelling (BIM) and other software being its highest-rated item (mean = 4.38), followed by project performance impact (mean = 4.30, RII = 0.859). EFA and CFA showed that the items loaded strongly on their constructs (CR = 0.896–0.915; AVE = 0.632–0.684), but the six criteria were highly intercorrelated (HTMT up to 0.994), indicating related dimensions of one overall construct. Repeated-Measures ANOVA indicated that differences among criteria means were not statistically significant (F = 1.117, p = 0.348). Furthermore, multiple linear regression (R² = 0.884, p < 0.001) showed that functionality, usability, data management and security, and organisational support were significantly and positively associated with perceived project performance impact. These findings, which reflect predominantly large-contractor perspectives, provide practical guidance for contracting organisations modernising digital construction workflows in Malaysia.

Keywords

Cloud-based construction management software, Critical success factors, Building Information Modelling (BIM), Relative Importance Index, Malaysia

Downloads

References

1. Al Hadwer, A., Tavana, M., Gillis, D., & Rezania, D. (2021). A systematic review of organizational factors impacting cloud-based technology adoption using Technology-Organization-Environment framework. Internet of Things, 15, 100407. https://doi.org/10.1016/j.iot.2021.100407 [Google Scholar] [Crossref]

2. Assalaarachchi, L., Silva, K., & Hewagamage, C. (2022). Factors affecting the usage of cloud-based project management software in software development industry of Sri Lanka. 2022 2nd International Conference on Advanced Research in Computing (ICARC), 260–265. [Google Scholar] [Crossref]

3. https://doi.org/10.1109/ICARC54489.2022.9753717 [Google Scholar] [Crossref]

4. Assalaarachchi, L. I., Liyanage, M. P. P., & Hewagamage, C. (2025). A framework of critical success factors of cloud-based project management software adoption. International Journal of Information Systems and Project Management, 13(2), e4. https://doi.org/10.12821/ijispm130204 [Google Scholar] [Crossref]

5. Bello, S. A., Oyedele, L. O., Akinade, O. O., Bilal, M., Davila Delgado, J. M., Akanbi, L. A., Ajayi, A. O., & Owolabi, H. A. (2021). Cloud computing in construction industry: Use cases, benefits and challenges. Automation in Construction, 122, 103441. https://doi.org/10.1016/j.autcon.2020.103441 [Google Scholar] [Crossref]

6. Bujang, M. A., Omar, E. D., Foo, D. H. P., & Hon, Y. K. (2024). Sample size determination for conducting a pilot study to assess reliability of a questionnaire. Restorative Dentistry & Endodontics, 49(1), e3. https://doi.org/10.5395/rde.2024.49.e3 [Google Scholar] [Crossref]

7. Campbell, S., Greenwood, M., Prior, S., Shearer, T., Walkem, K., Young, S., Bywaters, D., & Walker, K. (2020). Purposive sampling: Complex or simple? Research case examples. Journal of Research in Nursing, 25(8), 652–661. https://doi.org/10.1177/1744987120927206 [Google Scholar] [Crossref]

8. Chang, J., Yong, L., Yi, Y., Liu, X., Song, H., Li, Y., Yang, M., Yao, L., & Song, N. (2021). Psychometric properties of the Exercise Orientation Questionnaire: A confirmatory study on Chinese university students. Frontiers in Public Health, 9, 574335. https://doi.org/10.3389/fpubh.2021.574335 [Google Scholar] [Crossref]

9. Cheung, G. W., Cooper-Thomas, H. D., Lau, R. S., & Wang, L. C. (2024). Reporting reliability, convergent and discriminant validity with structural equation modeling: A review and best-practice recommendations. Asia Pacific Journal of Management, 41, 745–783. https://doi.org/10.1007/s10490-023-09871-y [Google Scholar] [Crossref]

10. Chowdhury, M., Hosseini, M. R., Martek, I., Edwards, D. J., & Wang, J. (2021). The effectiveness of web-based technology platforms in facilitating construction project collaboration: A qualitative analysis of 1,152 user reviews. Journal of Information Technology in Construction, 26, 953–973. [Google Scholar] [Crossref]

11. https://doi.org/10.36680/j.itcon.2021.051 [Google Scholar] [Crossref]

12. Fornell, C., & Larcker, D. F. (1981). Evaluating structural equation models with unobservable variables and measurement error. Journal of Marketing Research, 18(1), 39–50. [Google Scholar] [Crossref]

13. https://doi.org/10.1177/002224378101800104 [Google Scholar] [Crossref]

14. Gamil, Y., Abdullah, M. A., Abd Rahman, I., & Asad, M. M. (2020). Internet of things in construction industry revolution 4.0: Recent trends and challenges in the Malaysian context. Journal of Engineering, Design and Technology, 18(5), 1091–1102. https://doi.org/10.1108/JEDT-06-2019-0164 [Google Scholar] [Crossref]

15. Greenhouse, S. W., & Geisser, S. (1959). On methods in the analysis of profile data. Psychometrika, 24(2), 95–112. https://doi.org/10.1007/BF02289823 [Google Scholar] [Crossref]

16. Gu, N., & London, K. (2010). Understanding and facilitating BIM adoption in the AEC industry. Automation in Construction, 19(8), 988–999. https://doi.org/10.1016/j.autcon.2010.09.002 [Google Scholar] [Crossref]

17. Hair, J. F., Black, W. C., Babin, B. J., & Anderson, R. E. (2019). Multivariate data analysis (8th ed.). Cengage Learning. [Google Scholar] [Crossref]

18. Haji-Othman, Y., Yusuff, M. S. S., & Ahmad, M. N. (2021). Pilot testing of internal consistency and reliability of questionnaire items in the compliance behavior of income zakat study. International Journal of Academic Research in Business and Social Sciences, 11(9), 1486–1496. [Google Scholar] [Crossref]

19. https://doi.org/10.46886/IJARBSS/v11-i9/14923 [Google Scholar] [Crossref]

20. Harris, J., Booth, A., Cargo, M., Hannes, K., Harden, A., Flemming, K., Garside, R., Pantoja, T., Thomas, J., & Noyes, J. (2024). Ethical guidance for conducting health research with online communities. Journal of Medical Internet Research, 26, e53770. https://doi.org/10.2196/53770 [Google Scholar] [Crossref]

21. Henseler, J., Ringle, C. M., & Sarstedt, M. (2015). A new criterion for assessing discriminant validity in variance-based structural equation modeling. Journal of the Academy of Marketing Science, 43(1), 115–135. https://doi.org/10.1007/s11747-014-0403-8 [Google Scholar] [Crossref]

22. Holt, G. D. (2014). Asking questions, analysing answers: Relative importance revisited. Construction Innovation, 14(1), 2–16. https://doi.org/10.1108/CI-06-2012-0035 [Google Scholar] [Crossref]

23. Hu, L., & Bentler, P. M. (1999). Cutoff criteria for fit indexes in covariance structure analysis: Conventional criteria versus new alternatives. Structural Equation Modeling, 6(1), 1–55. [Google Scholar] [Crossref]

24. https://doi.org/10.1080/10705519909540118 [Google Scholar] [Crossref]

25. International Organization for Standardization. (2020). ISO 21502:2020: Project, programme and portfolio management - Guidance on project management. ISO. [Google Scholar] [Crossref]

26. International Organization for Standardization. (2022). ISO/IEC 27001:2022: Information security, cybersecurity and privacy protection - Information security management systems - Requirements. ISO. [Google Scholar] [Crossref]

27. Jaafar, M., Mokhtar Azizi, N. S., Mohamed Ghazali, F. E., Mohd Zain, M. Z., Mat Kilau, N., & Ibrahim, F. S. (2026). Technology usage, challenges and strategies for Construction 4.0 from the perspective of Malaysian contractors. Journal of Facilities Management, 24(2), 327–351. [Google Scholar] [Crossref]

28. https://doi.org/10.1108/JFM-04-2024-0055 [Google Scholar] [Crossref]

29. Jaskula, K., Kifokeris, D., Papadonikolaki, E., & Rovas, D. (2024). Common data environments in construction: State-of-the-art and challenges for practical implementation. Construction Innovation, 25(5), 1522–1548. https://doi.org/10.1108/CI-04-2023-0088 [Google Scholar] [Crossref]

30. Jebb, A. T., Ng, V., & Tay, L. (2021). A review of key Likert scale development advances: 1995–2019. Frontiers in Psychology, 12, 637547. https://doi.org/10.3389/fpsyg.2021.637547 [Google Scholar] [Crossref]

31. Kaiser, H. F. (1974). An index of factorial simplicity. Psychometrika, 39(1), 31–36. [Google Scholar] [Crossref]

32. https://doi.org/10.1007/BF02291575 [Google Scholar] [Crossref]

33. Kamal, A., Azfar, R. W., Salah, B., Saleem, W., Abas, M., Khan, R., & Pruncu, C. I. (2021). Quantitative analysis of sustainable use of construction materials for supply chain integration and construction industry performance through structural equation modeling (SEM). Sustainability, 13(2), 522. https://doi.org/10.3390/su13020522 [Google Scholar] [Crossref]

34. Kock, N. (2015). Common method bias in PLS-SEM: A full collinearity assessment approach. International Journal of e-Collaboration, 11(4), 1–10. https://doi.org/10.4018/ijec.2015100101 [Google Scholar] [Crossref]

35. Maali, O., Lines, B., Smithwick, J., Hurtado, K., & Sullivan, K. (2020). Change management practices for adopting new technologies in the design and construction industry. Journal of Information Technology in Construction, 25, 325–341. https://doi.org/10.36680/j.itcon.2020.019 [Google Scholar] [Crossref]

36. Mohd Fateh, M. A., Amri, Q., & Zulkeflee, A. (2024). Cloud-based real-time collaboration in the construction planning phase: Adoption, implementation and success factors explored. Journal of Construction in Developing Countries, 29(2), 207–230. https://doi.org/10.21315/jcdc-11-23-0165 [Google Scholar] [Crossref]

37. Musarat, M. A., Alaloul, W. S., Khan, M. H. F., Ayub, S., & Guy, C. P. L. (2024). Evaluating cloud computing in construction projects to avoid project delay. Journal of Open Innovation: Technology, Market, and Complexity, 10(2), Article 100296. https://doi.org/10.1016/j.joitmc.2024.100296 [Google Scholar] [Crossref]

38. Oke, A. E., Kineber, A. F., Albukhari, I., Othman, I., & Kingsley, C. (2021). Assessment of cloud computing success factors for sustainable construction industry: The case of Nigeria. Buildings, 11(2), 36. https://doi.org/10.3390/buildings11020036 [Google Scholar] [Crossref]

39. Onungwa, I., Olugu-Uduma, N., & Shelden, D. R. (2021). Cloud BIM technology as a means of collaboration and project integration in smart cities. SAGE Open, 11(3). [Google Scholar] [Crossref]

40. https://doi.org/10.1177/21582440211033250 [Google Scholar] [Crossref]

41. Othman, I., Al-Ashmori, Y. Y., Rahmawati, Y., Amran, Y. H. M., & Al-Bared, M. A. M. (2021). The level of Building Information Modelling (BIM) implementation in Malaysia. Ain Shams Engineering Journal, 12, 455–463. https://doi.org/10.1016/j.asej.2020.04.007 [Google Scholar] [Crossref]

42. Podsakoff, P. M., MacKenzie, S. B., Lee, J.-Y., & Podsakoff, N. P. (2003). Common method biases in behavioral research: A critical review of the literature and recommended remedies. Journal of Applied Psychology, 88(5), 879–903. https://doi.org/10.1037/0021-9010.88.5.879 [Google Scholar] [Crossref]

43. Project Management Institute. (2021). A guide to the project management body of knowledge (PMBOK guide) (7th ed.). Project Management Institute. [Google Scholar] [Crossref]

44. Singh, S., Zaki, R. A., Nik Farid, N. D., & Kaur, K. (2021). Reliability analysis of the Malay version of the Center for Epidemiologic Studies Depression Scale (CESD) among adolescents in Malaysia. Preventive Medicine Reports, 24, 101585. https://doi.org/10.1016/j.pmedr.2021.101585 [Google Scholar] [Crossref]

45. Stieninger, M., Nedbal, D., Wetzlinger, W., Wagner, G., & Erskine, M. A. (2018). Factors influencing the organizational adoption of cloud computing: A survey among cloud workers. International Journal of Information Systems and Project Management, 6(1), 5–23. [Google Scholar] [Crossref]

46. Succar, B. (2009). Building information modelling framework: A research and delivery foundation for industry stakeholders. Automation in Construction, 18(3), 357–375. [Google Scholar] [Crossref]

47. https://doi.org/10.1016/j.autcon.2008.10.003 [Google Scholar] [Crossref]

48. Tanga, O., Akinradewo, O., Aigbavboa, C., & Thwala, D. (2022). Cyber-attack risks to construction data management in the fourth industrial revolution era: A case of Gauteng province, South Africa. Journal of Information Technology in Construction, 27, 845–863. [Google Scholar] [Crossref]

49. https://doi.org/10.36680/j.itcon.2022.041 [Google Scholar] [Crossref]

50. Waqar, A., Skrzypkowski, K., Almujibah, H., Zagorski, K., Khan, M. B., Zagorska, A., & Benjeddou, O. (2023). Success of implementing cloud computing for smart development in small construction projects. Applied Sciences, 13(9), 5713. https://doi.org/10.3390/app13095713 [Google Scholar] [Crossref]

51. Won, D., Hwang, B. G., & Binte Mohd Samion, N. K. (2022). Cloud computing adoption in the construction industry of Singapore: Drivers, challenges, and strategies. Journal of Management in Engineering, 38(2), Article 05021017. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001001 [Google Scholar] [Crossref]

52. Xu, A., Baysari, M. T., Stocker, S. L., Leow, L. J., Day, R. O., & Carland, J. E. (2020). Researchers’ views on, and experiences with, the requirement to obtain informed consent in research involving human participants: A qualitative study. BMC Medical Ethics, 21, 93. https://doi.org/10.1186/s12910-020-00538-7 [Google Scholar] [Crossref]

53. Yap, J. B. H., & Oo, J. H. (2025). Silent failures: Uncovering the root causes of poor communication in Malaysian construction projects. Journal of Construction in Developing Countries, 30(2), 109–136. [Google Scholar] [Crossref]

54. https://doi.org/10.21315/jcdc.2025.30.2.5 [Google Scholar] [Crossref]

55. Yusoff, M. S. B., Arifin, W. N., & Hadie, S. N. H. (2021). ABC of questionnaire development and validation for survey research. Education in Medicine Journal, 13(1), 97–108. [Google Scholar] [Crossref]

56. https://doi.org/10.21315/eimj2021.13.1.10 [Google Scholar] [Crossref]

Metrics

Views & Downloads

Similar Articles