Cash-Flow Monitoring and Evaluation as a Predictor of Public Infrastructure Project Performance: Evidence From UNRA, Uganda

Authors

Geoffrey Karyeija

Universal Technology and Management University (Uganda)

Dr. J. M. O. Tukei

Universal Technology and Management University (Uganda)

C. D. Alupo

Uganda Revenue Authority (Uganda)

L. Tukei

Capital Markets Authority (Uganda)

E. R. Ayait

Uganda Police Force (Uganda)

Article Information

DOI: 10.47772/IJRISS.2026.101100166

Subject Category: Project Management

Volume/Issue: 10/11 | Page No: 2458-2468

Publication Timeline

Submitted: 2026-10-15

Accepted: 2026-10-20

Published: 2026-11-21

Abstract

Public infrastructure projects rarely proceed exactly according to their original financial and implementation assumptions. Prices change, work schedules shift, quantities are revised, payment obligations accumulate and funding priorities may be adjusted. Under such conditions, the effectiveness of monitoring and evaluation (M&E) becomes central to project control because it provides the information required to identify deviations, explain their causes and initiate corrective action. This article examined the relationship between cash-flow monitoring and evaluation and the implementation of public infrastructure projects at the Uganda National Roads Authority (UNRA). The article was derived from a convergent mixed-methods study involving 78 questionnaire respondents, 10 key informants and documentary evidence from ten substantially completed road-infrastructure projects. Quantitative evidence was analysed using descriptive statistics, Pearson's correlation and simple linear regression, while qualitative and documentary evidence were examined thematically. The findings showed persistent concerns regarding audit follow-up, updating of budgets and cost estimates, feedback mechanisms, financial tracking and adaptation of financial policies. Respondents strongly supported regular audits, phased technical reviews, systematic tracking of audit recommendations and continuous revision of budgets and policies. Cash-flow M&E had a strong, positive and statistically significant relationship with public infrastructure-project implementation (r = .740, p < .01). Regression analysis further established that cash-flow M&E significantly predicted project implementation (β = .740, p < .001) and explained 54.7% of the observed variation in implementation outcomes (R² = .547; adjusted R² = .538; F = 60.437). Among the three cash-flow-management dimensions examined in the parent study, M&E made the largest single explanatory contribution. The study concludes that cash-flow M&E is not merely a reporting or compliance function; it is an adaptive management capability through which financial variance is detected, accountability is strengthened and evidence is translated into corrective decisions. The article recommends risk-based audits, routine budget-versus-actual reviews, electronic tracking of audit recommendations and stronger integration of financial and physical-progress monitoring.

Keywords

Cash-Flow Monitoring and Evaluation; Infrastructure Performance; Financial Accountability; Auditing; Project Monitoring; Financial Tracking; UNRA; Uganda

Downloads

References

1. Creswell, J. W., & Creswell, J. D. (2018). Research design: Qualitative, quantitative, and mixed methods approaches (5th ed.). SAGE Publications. [Google Scholar] [Crossref]

2. Ggoobi, R., Lukwago, D., & Bogere, G. (2020). Public expenditure governance in the roads sector. Advocates Coalition for Development and Environment. [Google Scholar] [Crossref]

3. Goergens, M., & Kusek, J. Z. (2009). Making monitoring and evaluation systems work: A capacity development toolkit. World Bank. [Google Scholar] [Crossref]

4. Ika, L. A., & Pinto, J. K. (2022). The “re-meaning” of project success: Updating and recalibrating for modern project management. International Journal of Project Management, 40(7), 835–848. https://doi.org/10.1016/j.ijproman.2022.08.001 [Google Scholar] [Crossref]

5. Lamhauge, N., Lanzi, E., & Agrawala, S. (2012). Monitoring and evaluation for adaptation: Lessons from development co-operation agencies. OECD Environment Working Papers, No. 38. OECD Publishing. https://doi.org/10.1787/5kg20mj6c2bw-en [Google Scholar] [Crossref]

6. Musyimi, C. M., & Ondara, A. (2022). Collaborative monitoring and evaluation practices and performance of county-funded projects in Uasin Gishu County, Kenya. Journal of Information Sciences and Project Management, 3(7). [Google Scholar] [Crossref]

7. Njeru, C. M., & Kirui, C. (2022). Monitoring and evaluation practices and performance of Kenya National Highway Authority road construction projects in Nairobi City County, Kenya. Journal of Entrepreneurship & Project Management, 2(1), 11–27. https://doi.org/10.70619/vol2iss1pp11-27 [Google Scholar] [Crossref]

8. Uganda National Roads Authority. (2021/2022). Annual performance report. UNRA. [Google Scholar] [Crossref]

9. Uganda National Roads Authority. (2022). Project status report. UNRA. [Google Scholar] [Crossref]

10. Zohrabi, M. (2013). Mixed method research: Instruments, validity, reliability and reporting findings. Theory and Practice in Language Studies, 3(2), 254–262. https://doi.org/10.4304/tpls.3.2.254-262 [Google Scholar] [Crossref]