Development of a Risk Management Support Framework for Effective Construction Project Delivery in Imo State, Nigeria
Authors
Department of Project Management Technology, Federal University of Technology, Owerri, Imo State (Nigeria)
Department of Project Management Technology, Federal University of Technology, Owerri, Imo State (Nigeria)
Department of Project Management Technology, Federal University of Technology, Owerri, Imo State (Nigeria)
Department of Electrical/Electronic Engineering, Federal University of Technology, Owerri, Imo State (Nigeria)
Article Information
DOI: 10.47772/IJRISS.2025.91100601
Subject Category: Management
Volume/Issue: 9/11 | Page No: 7715-7725
Publication Timeline
Submitted: 2025-12-03
Accepted: 2025-12-10
Published: 2025-12-26
Abstract
Construction projects in Imo State, Nigeria, are often plagued by delays, cost overruns, and quality issues, largely due to inadequate risk-management practices. This study develops and operationalizes a Risk Management Support Framework (RMSF) to enhance effective construction project delivery in the region. Using a mixed-methods approach, data were collected from 180 construction professionals through structured questionnaires and interviews. Quantitative data were analyzed using descriptive statistics, PCA, and multiple regression analysis, while qualitative data were thematically analyzed. Findings reveal that poor risk identification, lack of standardized assessment tools, weak framework updating mechanisms, and insufficient stakeholder engagement are major obstacles to successful project delivery. While the baseline regression model explained 61% of the variance in project delivery performance, a secondary integrated framework-validation phase—integrating standardized processes, feedback loops, and stakeholder coordination—improved explanatory power to 85%. The proposed RMSF provides a structured, adaptive, and context-sensitive guide for improving planning efficiency, reducing delays, minimizing cost overruns, and enhancing overall construction performance in Imo State.
Keywords
Risk Management, Construction Projects, Project Delivery, Support Framework, Nigeria
Downloads
References
1. Aibinu, A. A., & Jagboro, G. O. (2002). The effects of construction delays on project delivery in the Nigerian construction industry. International Journal of Project Management, 20(8), 593–599. https://doi.org/10.1016/S0263-7863(02)00028-5 [Google Scholar] [Crossref]
2. Alexander, S. (1998). Risk management in construction: Trends and challenges. Thomas Telford. [Google Scholar] [Crossref]
3. Amade, B., & Akpan, E. O. (2020). Risk management practices in Nigerian construction projects. Journal of Engineering, Design and Technology, 18(6), 1491–1508. [Google Scholar] [Crossref]
4. Akinradewo, O., Oyedele, L., & Ajayi, A. (2021). Digital risk management in construction projects in developing economies. Built Environment Project and Asset Management, 11(4), 610–626. [Google Scholar] [Crossref]
5. Ameh, O. J., Soyingbe, A. A., & Odusami, K. T. (2010). Significant factors causing cost overruns in telecommunication projects in Nigeria. Journal of Construction in Developing Countries, 15(2), 49–67. [Google Scholar] [Crossref]
6. Awodele, O. A. (2012). Framework for managing risk in construction projects. Journal of Building Performance, 3(1), 34–45. [Google Scholar] [Crossref]
7. Baloi, D., & Price, A. D. F. (2003). Modelling global risk factors affecting construction cost performance. International Journal of Project Management, 21(4), 261–269. [Google Scholar] [Crossref]
8. https://doi.org/10.1016/S0263-7863(02)00017-0 [Google Scholar] [Crossref]
9. Cagliano, A. C., Grimaldi, S., & Rafele, C. (2015). Choosing project risk management techniques: A theoretical framework. Management Decision, 53(1), 178–194. https://doi.org/10.1108/MD-06-2013-0358 [Google Scholar] [Crossref]
10. Chapman, C., & Ward, S. (2003). Project risk management: Processes, techniques and insights (2nd ed.). John Wiley & Sons. [Google Scholar] [Crossref]
11. Chileshe, N., & Kikwasi, G. J. (2014). Critical success factors for implementing risk management systems in developing countries: The case of Tanzania. Journal of Construction Engineering and Project Management, 4(2), 1–15. [Google Scholar] [Crossref]
12. Creswell, J. W., & Plano Clark, V. L. (2018). Designing and conducting mixed methods research (3rd ed.). Sage Publications. [Google Scholar] [Crossref]
13. Eadie, R., Millar, P., & Toner, A. (2013). Risk management in public sector construction projects: A case study of Northern Ireland. International Journal of Construction Management, 13(1), 35–49. https://doi.org/10.1080/15623599.2013.10773200 [Google Scholar] [Crossref]
14. Ezeokoli, F. O. (2015). Risk factors affecting building project performance in Anambra State, Nigeria. Nigerian Journal of Technology, 34(3), 569–576. https://doi.org/10.4314/njt.v34i3.20 [Google Scholar] [Crossref]
15. Grey, S. (1995). Practical risk assessment for project management. John Wiley & Sons. [Google Scholar] [Crossref]
16. Hillson, D., & Simon, P. (2012). Practical project risk management: The ATOM methodology (2nd ed.). Management Concepts Press. [Google Scholar] [Crossref]
17. Kothari, C. R. (2014). Research methodology: Methods and techniques (3rd ed.). New Age International Publishers. [Google Scholar] [Crossref]
18. Love, P. E. D., Matthews, J., Simpson, I., Hill, A., & Olatunji, O. (2021). BIM-based risk management: An integrated framework. Automation in Construction, 127, 103718. [Google Scholar] [Crossref]
19. Osei-Kyei, R., Chan, A. P. C., & Ameyaw, E. (2022). Digital transformation and risk management in infrastructure projects. International Journal of Project Management, 40(6), 531–546. [Google Scholar] [Crossref]
20. Mahamid, I. (2012). Factors affecting contractor’s risk attitudes in construction projects: A case study. Engineering, Construction and Architectural Management, 19(6), 633–653. [Google Scholar] [Crossref]
21. https://doi.org/10.1108/09699981211277552 [Google Scholar] [Crossref]
22. McNamara, G., Rejda, M., & Michael, J. (2014). Principles of risk management and insurance. Pearson Education. [Google Scholar] [Crossref]
23. Mugenda, O. M., & Mugenda, A. G. (2003). Research methods: Quantitative and qualitative approaches. Acts Press. [Google Scholar] [Crossref]
24. Nunnally, J. C. (1978). Psychometric theory (2nd ed.). McGraw-Hill. [Google Scholar] [Crossref]
25. Ogwueleka, A. C. (2011). The critical success factors influencing project performance in Nigeria. International Journal of Management Science and Engineering Management, 6(5), 343–349. https://doi.org/10.1080/17509653.2011.10671183 [Google Scholar] [Crossref]
26. Olatunji, O. A., Aghimien, D. O., & Aigbavboa, C. O. (2023). Emerging technologies and construction risk mitigation in Africa. Journal of Construction Engineering and Management, 149(3), 04022144. [Google Scholar] [Crossref]
27. Olawale, Y. A., & Sun, M. (2010). Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice. Construction Management and Economics, 28(5), 509–526. https://doi.org/10.1080/01446191003674519 [Google Scholar] [Crossref]
28. Olomolaiye, P., Aibinu, A. A., & Jagboro, G. O. (2010). Risk management in the Nigerian construction industry. Nigerian Journal of Construction Technology and Management, 11(2), 23–35. [Google Scholar] [Crossref]
29. Project Management Institute (PMI). (2017). A guide to the project management body of knowledge (PMBOK® Guide) (6th ed.). Project Management Institute. [Google Scholar] [Crossref]
30. Saunders, M., Lewis, P., & Thornhill, A. (2017). Research methods for business students (7th ed.). Pearson Education. [Google Scholar] [Crossref]
31. Serpella, A., Ferrada, X., Howard, R., & Rubio, L. (2014). Risk management in construction projects: A knowledge-based approach. Procedia – Social and Behavioral Sciences, 119, 653–662. https://doi.org/10.1016/j.sbspro.2014.03.073 [Google Scholar] [Crossref]
32. Tohidi, H. (2018). The role of risk management in achieving project success. Procedia Technology, 1(3), 366–371. https://doi.org/10.1016/j.protcy.2012.02.077 [Google Scholar] [Crossref]
33. Zhao, X., Hwang, B. G., & Low, S. P. (2013). Critical success factors for enterprise risk management in Chinese construction companies. Construction Management and Economics, 31(12), 1199–1214. https://doi.org/10.1080/01446193.2013.867521 [Google Scholar] [Crossref]
34. Zou, P. X. W., Zhang, G., & Wang, J. (2007). Understanding the key risks in construction projects in China. International Journal of Project Management, 25(6), 601–614. [Google Scholar] [Crossref]
35. https://doi.org/10.1016/j.ijproman.2007.03.001 [Google Scholar] [Crossref]
Metrics
Views & Downloads
Similar Articles
- The Indirect Effect of Liquidity and Activity on Company Value with Profitability as an Intervening Variable
- Effect of Financial Skills, Knowledge, and Attitude on The Financial Behaviour of Clergy
- A Decade of Review: Trends in Budget Execution and Financial Performance of Development Projects in Tanzania (2014/15-2023/24)
- The Influence of Pre-Project Planning on the Budget Absorption Rate of Public Funded Infrastructure Projects in Kenya a Comparative Case Study of Narok, Migori, and Kisii County Government Projects
- Assessment of Factors Influencing Digital Transformation in Hotels’ Facility Management in Abuja Metropolis, Nigeria