Digital Material Procurement and Inventory Management System for Construction Projects

Authors

Wong Ying Ying

Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81300 Johor Bahru, Johor (Malaysia)

Chua Moh Gin

Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81300 Johor Bahru, Johor (Malaysia)

Najwa Safiyya

Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81300 Johor Bahru, Johor (Malaysia)

Sandra Ainah Nadirah

Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81300 Johor Bahru, Johor (Malaysia)

Amry Akashah

Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81300 Johor Bahru, Johor (Malaysia)

Hamizah Liyana Tajul Ariffin

Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81300 Johor Bahru, Johor (Malaysia)

Norhazren Izatie Mohd

Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81300 Johor Bahru, Johor (Malaysia)

Article Information

DOI: 10.47772/IJRISS.2026.1014MG0032

Subject Category: Management

Volume/Issue: 10/14 | Page No: 386-399

Publication Timeline

Submitted: 2026-02-05

Accepted: 2026-02-11

Published: 2026-02-21

Abstract

Efficient material procurement and inventory control are critical to project time, cost, and site productivity in construction. However, many construction projects in Malaysia still rely heavily on manual practices such as paper-based requisition forms, WhatsApp communication, and basic spreadsheet records. Despite the availability of digital technologies, these fragmented and informal methods remain common. As a result, material-related information is often inaccurate, delayed, or inconsistent, leading to poor coordination among project teams. These weaknesses frequently cause material duplication, wastage, stock shortages, and avoidable construction delays. This study critically examines the limitations of manual material management practices and their impact on overall project performance. Through system analysis and process re-engineering, existing procurement and inventory workflows were analyzed to identify operational inefficiencies and gaps in information flow. The findings reveal that the absence of an integrated system is a key contributor to poor data visibility and weak decision-making. In response, this study proposes a digital Material Procurement and Inventory Management System tailored to the needs of construction projects. The system integrates material requests, approval processes, purchase orders, delivery tracking, and real-time inventory updates within a single platform. Developed using web-based technologies and supported by a cloud database, the system aims to improve transparency, reduce human error, and support timely decision-making. The results demonstrate that adopting a digital material management system can significantly improve operational efficiency, enhance data accuracy, and reduce material-related delays and waste, thereby supporting the Malaysian construction industry's digital transformation efforts.

Keywords

Material Management, Procurement System, Construction Industry, Inventory Tracking

Downloads

References

1. Kasim, N., Kusumaningtias, R., & Sarpin, N. (2019). Enhancing material tracking practices of material management in construction projects. International Journal of Sustainable Construction Engineering Technology, 10(2). https://doi.org/10.30880/ijscet.2019.10.02.006 [Google Scholar] [Crossref]

2. Kereri, James. 2018. Use of Technology in Material Tracking in the Construction Industry Business. https://www.researchgate.net/publication/329413018. [Google Scholar] [Crossref]

3. Adlina. (2023, August 11). Kajian global mempamerkan cabaran penting industri pembinaan. Retrieved from https://www.cidb.gov.my/eng/global-survey-highlights-construction-industry-challenges/ [Google Scholar] [Crossref]

4. Mohamed Yusuf Wayrah, Norliana Sarpin, Mohamed, S., & Md. Asrul Nasid Masrom. (2021). The Impact of Material Management on Construction Project Delivery in Somalia. Journal of Technology Management and Business, 8(1). https://doi.org/10.30880/jtmb.2021.08.01.008 [Google Scholar] [Crossref]

5. Al-Aidrous, A.-H. M. H., Hern, N. J., Rahmawati, Y., Jahja, M., Yusof, K. W., Zawawi, N. A. W. A., & Utomo, C. (2022). Critical Factors Influencing Inventory And Procurement System Of Infrastructure Projects. Journal of Civil Engineering and Management, 28(8), 634–645. https://doi.org/10.3846/jcem.2022.16681 [Google Scholar] [Crossref]

6. Ibrahim, O. A., Mohammed, I. A., & Varouqa, I. F. (2020). Materials management on construction sites using RFID technique. International Journal of Scientific and Technology Research, 9(4), 1575–1581. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-85084242229&partnerID=40&md5=da84725f45d40c3e10a1ce8a629fabb9 [Google Scholar] [Crossref]

7. Kasim, N. (2015). Intelligent materials tracking system for construction projects management. Journal of Engineering and Technological Sciences, 47(2), 218–230. https://doi.org/10.5614/j.eng.technol.sci.2015.47.2.11 [Google Scholar] [Crossref]

8. Kasim, N., Shamsuddin, A., Zainal, R., & Kamarudin, N. C. (2012). Implementation of RFID technology for real-time materials tracking process in construction projects. In CHUSER 2012 - 2012 IEEE Colloquium on Humanities, Science and Engineering Research (pp. 699–703). https://doi.org/10.1109/CHUSER.2012.6504402 [Google Scholar] [Crossref]

9. Murthi, P., Poongodi, K., & Geetha, M. (2023). Inventory Management of Construction Project Through ABC Analysis: A Case Study. In Lecture Notes in Civil Engineering (Vol. 346 LNCE, pp. 95–105). https://doi.org/10.1007/978-981-99-2552-0_8 [Google Scholar] [Crossref]

10. Mustapa, F. D., Mustapa, M., Misnan, M. S., & Mahmud, S. H. (2012). ICT adoption in materials management among construction firms in construction industry. In CHUSER 2012 - 2012 IEEE Colloquium on Humanities, Science and Engineering Research (pp. 342–346). https://doi.org/10.1109/CHUSER.2012.6504336 [Google Scholar] [Crossref]

11. Navon, R., & Berkovich, O. (2006). An automated model for materials management and control. Construction Management and Economics, 24(6), 635–646. https://doi.org/10.1080/01446190500435671 [Google Scholar] [Crossref]

12. Ngor, K. K., Brahim, J., Zakaria, I., Kaish, A. B. M. A., & Mohsen, M. (2019). The state of the art of materials management research in the construction industry. MATEC Web of Conferences, 266, 05013. https://doi.org/10.1051/matecconf/201926605013 [Google Scholar] [Crossref]

13. Prakash Chandar, S., Anal, P., & Ganapathyramasamy, N. (2016). Developing of RFID automation technique in material management for various construction project. International Journal of Chemical Sciences, 14, 164–174. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-85018684321&partnerID=40&md5=58a085afd9100a8066353d145e266ed6 [Google Scholar] [Crossref]

14. Shah, V., & Shah, S. P. (2023). Impact of Material Management Techniques on Construction Project Performance Using ERP Software: A State of Art Review. In AIP Conference Proceedings (Vol. 2855). https://doi.org/10.1063/5.0168493 [Google Scholar] [Crossref]

15. Tsai, M. K., Lin, C. Y., & Yang, J. B. (2008). Simplifying on-site report completion for material management. In EASEC-11 - Eleventh East Asia-Pacific Conference on Structural Engineering and Construction. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-84870986398&partnerID=40&md5=e726986a9950500eadf391e30f8f1c09 [Google Scholar] [Crossref]

Metrics

Views & Downloads

Similar Articles