Optimizing Cost and Project Management in Zambia’s Mining Infrastructure Projects: A Case of Lubambe Copper Mine Limited
Authors
Department of civil and environmental engineering, University of Zambia, Zambia (Zambia)
Department of civil and environmental engineering, University of Zambia, Zambia (Zambia)
Article Information
DOI: 10.47772/IJRISS.2026.10200545
Subject Category: Social science
Volume/Issue: 10/2 | Page No: 7578-7608
Publication Timeline
Submitted: 2026-02-28
Accepted: 2026-03-05
Published: 2026-03-19
Abstract
The mining sector remains a cornerstone of Zambia’s economy through its contribution to gross domestic product, export earnings, and employment. Despite this importance, mining infrastructure projects continue to experience persistent cost inefficiencies and project management challenges that undermine operational performance. This study investigated the factors influencing the optimization of cost and project management in Zambia’s mining infrastructure projects, using Lubambe Copper Mine as a qualitative case study. The research adopted a qualitative case study design and purposively engaged ten expert participants drawn from engineering, project management, cost control, and senior management roles directly involved in project planning, implementation, and financial oversight. Primary data were collected through semi structured questionnaires and analyzed using a thematic analysis approach. The analysis followed a systematic coding process that involved initial familiarization with the data, open coding to identify meaningful units of information, axial coding to group related codes, and selective coding to consolidate these groups into higher order themes. Themes were derived inductively based on patterns of recurrence, emphasis, and explanatory strength across participant responses, ensuring that findings were grounded in participants’ lived experiences and professional insights. The findings revealed five dominant and interrelated themes influencing cost and project management optimization. The most prominent themes were procurement and supply chain inefficiencies and weak scope definition, both of which were consistently identified as primary drivers of cost overruns and project delays. These were followed by workforce competence gaps and limited integration of technological systems, which constrained coordination and real time cost control. Leadership discipline and accountability emerged as a cross-cutting theme shaping the effectiveness of all other factors. Integration between cost and project management was found to be further constrained by institutional rigidity, fragmented information systems, poor interdepartmental communication, and cultural resistance to change. Based on these prioritized themes, the study developed a four-stage optimization framework comprising collaborative planning, synchronized execution, real time monitoring, and continuous feedback. The study recommends policy and regulatory support from the Ministry of Mines and Minerals Development, the Zambia Public Procurement Authority, and the Engineering Institution of Zambia, alongside the adoption of integrated enterprise resource planning systems and sustained capacity building within mining firms. The study contributes to knowledge by offering an empirically grounded and context specific framework for integrating cost and project management in mining infrastructure projects within developing economies.
Keywords
Mining infrastructure projects involve the development of critical facilities
Downloads
References
1. Abdullahi, M. (2021). The Efficient Market Hypothesis: A critical review of Equilibrium Models and Imperical Evidence. From africanscholarpublications.com: https://www.africanscholarpublications.com/wp-content/uploads/2022/03/AJMSE_Vol23_No7_Dec2021-23.pdf [Google Scholar] [Crossref]
2. Adam, I., & Fazekas, M. (2023). Overview of corruption and anti-corruption in infrastructure development. From www.u4.no: https://www.u4.no/publications/overview-of-corruption-and-anti-corruption-in-infrastructure-development.pdf [Google Scholar] [Crossref]
3. Adebayo, E., & Werker, E. (2021). How much are benefit-sharing agreements worth to communities affected by mining? From sciencedirect.com: https://www.sciencedirect.com/science/article/pii/S0301420720309983 [Google Scholar] [Crossref]
4. Ali, M., & Rafique, Q. (2024). Strategic Integration of Real Options for Enhanced Valuation and Optimization in Mining Project Planning under Uncertainty: A Comprehensive Review. Retrieved 2025 from https://www.researchgate.net/publication/380387534 Strategic_Integration_of Real_Options for_Enhanced_Valuation_and_Optimization_in_Mining_Project_Planning_under_Uncertainty_A_Comprehensive_Review [Google Scholar] [Crossref]
5. Andronova, I., Haabazoka, L., & Kasonde, A. M. (2022). The government policy of Zambia on attracting foreign direct investment and its effectiveness. From researchgate.net: https://www.researchgate.net/publication/360192598_The_government_policy_of_Zambia_on_attracting_foreign_direct_investment_and_its_effectiveness [Google Scholar] [Crossref]
6. Aurélien, N., Ousmane, S., & Pitiya, R. P. (2022). Zambia’s Copperbelt Area and Copper Mining: A Review. From scirp.org: https://www.scirp.org/journal/paperinformation?paperid=115816 [Google Scholar] [Crossref]
7. Azubuike, S. I., Nakanwagi, S., & Pinto , J. (2022). Mining Resource Corridor development in Nigeria: critical considerations and actions for a diversified and sustainable economic future. From Springer: https://link.springer.com/article/10.1007/s13563-022-00307-5 [Google Scholar] [Crossref]
8. Badakhshan, N., Shahriar, K., Afraei , S., & Bakhtavar, E. (2023). Determining the environmental costs of mining projects: A comprehensive quantitative assessment. Retrieved 2025 from https://www.sciencedirect.com/science/article/abs/pii/S0301420723002726 [Google Scholar] [Crossref]
9. Bag, S. (2016). Project Risks Affecting Performance in Mining Industry: A South African Perspective. From researchgate.net: https://www.researchgate.net/publication/289649340_Project Risks Affecting Performance_in_Mining_Industry_A_South_African_Perspective [Google Scholar] [Crossref]
10. Baleni, P., & Gande, T. (2023). Utilising Best Practice in Project Planning and Scheduling for Capital Projects Success: Assessing the Importance of a Botswana Mining Company’s Strategy-Sensitive Capital Projects. From scirp.org: https://www.scirp.org/journal/paperinformation?paperid=125807 [Google Scholar] [Crossref]
11. Balyuk, A. (2025). How to Overcome Parkinson’s Law and Deliver Projects in Half the Time. From epicflow.com: https://www.epicflow.com/blog/how-to-beat-parkinsons-law-and-deliver-projects-in-half-the-time/ [Google Scholar] [Crossref]
12. Botin, J., & Vergara, M. A. (2015). A cost management model for economic sustainability and continuos improvement of mining operations. Retrieved 2025 from https://www.researchgate.net/publication/283881773_A_cost_management_model_for_economic_sustainability_and_continuos_improvement_of_mining_operations [Google Scholar] [Crossref]
13. Boyle, M. J., & Jiwon, M. (2022). Market Efficiency Explained: Differing Opinions and Examples. From investopedia.com: https://www.investopedia.com/terms/m/marketefficiency.asp [Google Scholar] [Crossref]
14. Bratus, M. (2024). Investment Strategies in Early-Stage Mining Ventures: A Lens on Critical Metals Amid Global Demand Surges. Retrieved 2025 from https://www.researchgate.net/publication/ 385213081_Investment_Strategies_in_Early-Stage_Mining Ventures A_Lens_on Critical_Metals Amid_Global_Demand_Surges [Google Scholar] [Crossref]
15. Buthelezi, M. Q., & Naidoo , S. (2024). Development of a project management framework for the digitalisation of mining operations. From researchgate.net: https://www.researchgate.net/publication/ 385489931_Development_of_a_project_management_framework_for_the_digitalisation_of_mining_operations [Google Scholar] [Crossref]
16. Buthelezi, M., & Naidoo, S. (2024). Development of a project management framework for the digitalisation of mining operations. Retrieved 2025 from https://journals.co.za/doi/full/10.4102/sajim.v26i1.1839?download= [Google Scholar] [Crossref]
17. Buzinkay, M. (2024). Mine security and how to implement access control. From identecsolutions.com: https://www.identecsolutions.com/news/mine-security-and-how-to-implement-access-control [Google Scholar] [Crossref]
18. Callaca, J. M., Chochabot, J., Vilca, A., & Noa, D. T. (2024). Cost Management Model in the Subway and Open Pit Mines: A Systematic Review. Retrieved 2025 from https://www.researchgate.net/publication/378810585_Cost_Management_Model_in_the_Subway_and_Open_Pit_Mines_A_Systematic_Review [Google Scholar] [Crossref]
19. Chang , H., Jiyoung , S., & Shuna , S. H. (2023). Conflicts between mining companies and communities: Institutional environments and conflict resolution approaches. From onlinelibrary.wiley.com: https://onlinelibrary.wiley.com/doi/10.1111/beer.12522 [Google Scholar] [Crossref]
20. Chen, J., Kelly, R. C., & Kvilhaug, S. (2022). Informationally Efficient Market: Meaning, Hypothesis, Criticism. From investopedia.com: https://www.investopedia.com/terms/i/informationallyefficientmarket.asp [Google Scholar] [Crossref]
21. Chitemba, M., Bwalya, C., & Kalanda, T. (2025). Environmental, Social and Governance Law in Zambia. From iclg.com: https://iclg.com/practice-areas/environmental-social-and-governance-law/zambia [Google Scholar] [Crossref]
22. Christou , C., Turunen, J., Francisco , M., & Zaman, H. (2024). Zambia: Fourth Review Under the Arrangement Under the Extended Credit Facility and Financing Assurances Review—Debt Sustainability Analysis. From elibrary.imf.org: https://www.elibrary.imf.org/view/journals/002/2024/350/article-A002-en.xml [Google Scholar] [Crossref]
23. Dağgöl, E., & Özsoy, T. (2024). Project managers' understanding of continuous improvement in project management. Retrieved 2025 from https://www.researchgate.net/publication/378520113_PROJECT_MANAGERS%27_UNDERSTANDING_OF_CONTINUOUS_IMPROVEMENT_IN_PROJECT_MANAGEMENT [Google Scholar] [Crossref]
24. Daka, E. (2024). Assessing the Impact of Project Management Practices on the Success of Construction Projects in Zambia: A Case Study of the Construction Projects in Lusaka between 2022 and 2023. From researchgate.net: https://www.researchgate.net/publication/383883088 Assessing_the Impact_of Project_Management_Practices_on_the_Success_of_Construction_Projects_in_Zambia_A_Case_Study_of_the_Construction_Projects_in_Lusaka_between_2022_and_2023 [Google Scholar] [Crossref]
25. Du, X., Zhang, H., & Han, Y. (2022). How Does New Infrastructure Investment Affect Economic Growth Quality? Empirical Evidence from China. From MDPI: https://www.mdpi.com/2071-1050/14/6/3511 [Google Scholar] [Crossref]
26. Girma, A., & Patel, D. (2020). A critical literature review on improving project cost management practice and profitability of domestic contractors. Retrieved 2025 from https://www.researchgate.net/publication/341147015_A_CRITICAL_LITERATURE_REVIEW_ON_IMPROVING_PROJECT_COST_MANAGEMENT_PRACTICE_AND_PROFITABILITY_OF_DOMESTIC_CONTRACTORS [Google Scholar] [Crossref]
27. González-Ruiz, J. D., Mejia-Escobar, J. C., & Franco-Sepúlveda, G. (2021). Towards an Understanding of Project Finance in the Mining Sector in the Sustainability Context: A Scientometric Analysis. From mdpi.com: https://www.mdpi.com/2071-1050/13/18/10317 [Google Scholar] [Crossref]
28. Gubanov, R. S. (2023). Cost Minimization in Russia’s Mining Industry. From researchgate.net: https://www.researchgate.net/publication/372591215_Cost_Minimization_in_Russia%27s_Mining_Industry [Google Scholar] [Crossref]
29. Hyder, Z., Siau, K. L., & Nah, F. F.-H. (2019). Artificial Intelligence, Machine Learning, and Autonomous Technologies in Mining Industry. Retrieved 2025 from https://www.researchgate.net/publication/335542028_Artificial_Intelligence_Machine_Learning_and_Autonomous_Technologies_in_Mining_Industry [Google Scholar] [Crossref]
30. Irfan, M., Khan, S. Z., Hassan, N., Hassan, M., Habib, M., Khan, S., & Khan, H. H. (2021). Role of Project Planning and Project Manager Competencies on Public Sector Project Success. Retrieved 2025 from https://www.mdpi.com/2071-1050/13/3/1421 [Google Scholar] [Crossref]
31. RES. (2025). FitzStatistics : Advanced Analytics for Quantitative, Qualitative, and Mixed Methods. From research-expert-solutions.com: https://research-expert-solutions.com/empowering-higher-education-through-subscription-based-access-to-a-bundle-of-statistical-tools [Google Scholar] [Crossref]
32. RES. (2025). FitzStatistics. Retrieved from research-expert-solutions.com: https://research-expert-solutions.com/fitzstatistics [Google Scholar] [Crossref]
Metrics
Views & Downloads
Similar Articles
- The Impact of Ownership Structure on Dividend Payout Policy of Listed Plantation Companies in Sri Lanka
- Urban Sustainability in North-East India: A Study through the lens of NER-SDG index
- Performance Assessment of Predictive Forecasting Techniques for Enhancing Hospital Supply Chain Efficiency in Healthcare Logistics
- The Fractured Self in Julian Barnes' Postmodern Fiction: Identity Crisis and Deflation in Metroland and the Sense of an Ending
- Impact of Flood on the Employment, Labour Productivity and Migration of Agricultural Labour in North Bihar