A Conceptual Framework for Construction Delay Management Integrating Project and Weather Factors
Authors
Faculty of Civil Engineering Technology, Universiti Malaysia Pahang Al-Sultan Abdullah Lebuh Persiaran Tun Khalil Yaacob, 26300 Kuantan Pahang (Malaysia)
Faculty of Civil Engineering Technology, Universiti Malaysia Pahang Al-Sultan Abdullah Lebuh Persiaran Tun Khalil Yaacob, 26300 Kuantan Pahang (Malaysia)
Faculty of Civil Engineering Technology, Universiti Malaysia Pahang Al-Sultan Abdullah Lebuh Persiaran Tun Khalil Yaacob, 26300 Kuantan Pahang (Malaysia)
Faculty of Civil Engineering Technology, Universiti Malaysia Pahang Al-Sultan Abdullah Lebuh Persiaran Tun Khalil Yaacob, 26300 Kuantan Pahang (Malaysia)
Faculty of Civil Engineering Technology, Universiti Malaysia Pahang Al-Sultan Abdullah Lebuh Persiaran Tun Khalil Yaacob, 26300 Kuantan Pahang (Malaysia)
Article Information
DOI: 10.47772/IJRISS.2026.100600291
Subject Category: Project Management
Volume/Issue: 10/6 | Page No: 4203-4214
Publication Timeline
Submitted: 2026-06-02
Accepted: 2026-06-08
Published: 2026-06-22
Abstract
Construction project delays remain a major challenge in the construction industry, often leading to cost overruns, reduced productivity, contractual disputes, and poor project performance. Traditional project management approaches, which rely heavily on manual scheduling techniques and historical project records, are often insufficient to address the dynamic nature of construction environments, particularly when influenced by external factors such as weather conditions. Previous studies have primarily focused on identifying delay factors and developing predictive models based on historical project data, with limited integration of environmental variables and practical decision-support mechanisms. This study aims to identify the key factors influencing construction work delays and to develop a conceptual predictive framework that integrates project information with weather-related data to support more effective delay management. The proposed framework incorporates scheduling analysis through the Critical Path Method (CPM) to identify critical activities and evaluate potential delay risks that may affect project completion. In addition, the framework conceptually demonstrates how Artificial Intelligence (AI) and Machine Learning (ML) can be integrated with project and environmental data to enhance project monitoring, risk assessment, and planning processes. The framework was developed to illustrate the interaction between project scheduling information, weather-related variables, and predictive decision-making within a structured management system. Validation was conducted through semi-structured interviews involving three construction professionals with experience in project management and site operations. The evaluation focused on framework practicality, usability, and applicability in real construction environments. The experts generally agreed that the proposed framework is relevant and capable of supporting proactive delay management. The findings indicate that the integration of project and environmental data has the potential to improve planning accuracy, increase awareness of delay risks, and support proactive decision-making throughout the project lifecycle. The proposed framework contributes to the advancement of data-driven construction management practices and provides a foundation for future studies involving empirical validation using real project datasets.
Keywords
Construction delay management, project scheduling
Downloads
References
1. S. A. Assaf and S. Al-Hejji, “Causes of delay in large construction projects,” International Journal of Project Management, vol. 24, no. 4, pp. 349–357, 2006. [Google Scholar] [Crossref]
2. Haq, A., Hassan, M., & Rahman, S. (2014) Impact of weather conditions on project performance Construction Engineering Journal, 27, 62–71. [Google Scholar] [Crossref]
3. Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012) Analysing factors affecting delays in Indian construction projects International Journal of Project Management, 30(4), 479–489.B. [Google Scholar] [Crossref]
4. Flyvbjerg, “What you should know about megaprojects and why: An overview,” Project Management Journal, vol. 45, no. 2, pp. 6–19, 2014. [Google Scholar] [Crossref]
5. Sambasivan, M., & Soon, Y. W. (2007) Causes and effects of delays in Malaysian construction industry International Journal of Project Management, 25(5), 517–526. [Google Scholar] [Crossref]
6. Y. Pan and Z. Zhang, “Artificial intelligence in construction engineering,” Automation in Construction, vol. 124, pp. 103–115, 2021. [Google Scholar] [Crossref]
7. H. Yazici, R. Aydin, and A. Yildiz, “Deep learning in smart construction monitoring,” IEEE Access, vol. 11, pp. 1234–1246, 2023. [Google Scholar] [Crossref]
8. H. Gondia, A. S. Javed, and P. S. Chauhan, “AI-based predictive modelling for construction delay management,” Journal of Building Engineering, vol. 62, 2023. [Google Scholar] [Crossref]
9. M. Yaseen, T. Tariq, and R. Khan, “Machine learning applications in construction delay forecasting,” Automation in Construction, vol. 120, 2020. [Google Scholar] [Crossref]
10. N. Yusuwan and N. Adnan, “Factors contributing to delays in construction projects,” Journal of Construction Management, vol. 18, pp. 21–28, 2013. [Google Scholar] [Crossref]
11. R. Regona, F. Santos, and L. Kannan, “Barriers to AI adoption in the construction industry,” Journal of Civil Engineering Research, vol. 50, pp. 202–212, 2022. [Google Scholar] [Crossref]
12. V. Prabhakar, A. S. Javed, and P. S. Chauhan, “A review on challenges and solutions in the implementation of AI, IoT, and blockchain in construction,” Automation in Construction, vol. 150, pp. 104–118, 2023. [Google Scholar] [Crossref]
13. K. Fashina, M. Hassan, and A. Wahid, “Analysis of project delays in Malaysian public construction projects,” International Journal of Project Management, vol. 39, no. 3, pp. 230–242, 2021. [Google Scholar] [Crossref]
14. L. Rivera, J. Battaineh, and H. Alsuliman, “Impact of delays on residential and infrastructure projects,” Journal of Construction Engineering and Management, vol. 146, no. 7, pp. 1–12, 2020. [Google Scholar] [Crossref]
15. J. Yap, M. Skitmore, and K. Gray, “Critical delay factors affecting construction projects,” Automation in Construction, vol. 78, pp. 144–156, 2017. [Google Scholar] [Crossref]
16. E. Lokshina, T. North, and D. Guo, “Automation and intelligent systems for construction project management,” Journal of Intelligent Systems, vol. 28, no. 5, pp. 667–681, 2019. [Google Scholar] [Crossref]
17. Y. Wang, L. Xu, and C. Zhang, “Collaborative BIM integration for real-time project monitoring,” Advanced Engineering Informatics, vol. 59, pp. 101–122, 2024. [Google Scholar] [Crossref]
18. P. Gómez-Martínez, F. Pérez, and D. García, “Digital project management technologies for construction,” Journal of Construction Informatics, vol. 27, pp. 110–129, 2019. [Google Scholar] [Crossref]
19. M. Luque, R. Ruiz, and P. Torres, “Optimising construction workflows using AI-powered tools,” Automation in Construction, vol. 125, pp. 231–246, 2020. [Google Scholar] [Crossref]
20. Z. Tian and Q. He, “Smart construction management in the era of Industry 4.0,” Journal of Construction Innovation, vol. 23, no. 4, pp. 451–469, 2023. [Google Scholar] [Crossref]
21. E. Rischmoller, P. de Souza, and M. Araujo, “Technical tools to reduce construction errors,” Engineering Management Journal, vol. 18, no. 3, pp. 225–239, 2006. [Google Scholar] [Crossref]
22. J. Hickey, P. Rao, and T. Blake, “Digital tools for enhancing project precision,” Journal of Civil Engineering and Management, vol. 29, no. 2, pp. 205–222, 2023. [Google Scholar] [Crossref]
23. F. Ramón-Elizondo and L. Barboza-Arguedas, “Simulation-based design tools for complex projects,” Journal of Construction Simulation, vol. 31, pp. 150–165, 2019. [Google Scholar] [Crossref]
24. J. De Posgrado et al., “Real-time decision-making systems for complex construction projects,” Automation in Construction, vol. 114, 2020. [Google Scholar] [Crossref]
25. X. Luo, C. Li, and Y. Zhao, “Automation and connectivity in construction processes,” Journal of Civil Informatics, vol. 48, no. 6, pp. 601–615, 2022. [Google Scholar] [Crossref]
26. H. Aripin, M. Arshad, and N. Jamaludin, “Applicability of smart construction technologies,” Journal of Built Environment Research, vol. 14, no. 2, pp. 233–245, 2019. [Google Scholar] [Crossref]
27. R. Jia, Q. Lin, and S. Chen, “Intelligent construction frameworks for effective project delivery,” Construction Science and Technology, vol. 22, pp. 210–224, 2019. [Google Scholar] [Crossref]
28. Y. Jung, S. Park, and M. Lee, “Stakeholder-centric smart construction systems,” Journal of Construction Innovation, vol. 15, no. 4, pp. 512–530, 2023. [Google Scholar] [Crossref]
29. S. Park, H. Kim, and W. Han, “End-user utility in construction automation systems,” Automation in Construction, vol. 72, pp. 169–182, 2016. [Google Scholar] [Crossref]
30. J. Ahn, S. Lee, and M. Choi, “Cost-effective implementation of intelligent construction technologies,” Journal of Civil Engineering Research, vol. 19, no. 5, pp. 112–130, 2023. [Google Scholar] [Crossref]
31. L. Li, P. Nguyen, and K. Tan, “Measuring productivity indices in digital construction projects,” Journal of Project Management, vol. 36, pp. 441–455, 2021. [Google Scholar] [Crossref]
32. J. Álvarez, A. Salas, and F. Guzmán, “Digital transformation in construction industries,” International Journal of Advanced Engineering Research, vol. 42, pp. 77–95, 2017. [Google Scholar] [Crossref]
33. Zheng, Z., Wang, F., Gong, G., Yang, H., & Han, D. (2023b). Intelligent technologies for construction machinery using data-driven methods. Automation in Construction, 147, 104711. [Google Scholar] [Crossref]
34. Jose Luis Blanco, Steffen Fuchs, Matthew Parsons, & Maria João Ribeirinho. (2018). Engineering and construction is behind the curve in implementing artificial intelligence solutions. [Google Scholar] [Crossref]
35. Sen, D., Ozturk, M., & Vayvay, O. (2016). An Overview of Big Data for Growth in SMEs. Procedia - Social and Behavioral Sciences, 235, 159–167. [Google Scholar] [Crossref]
36. Wamba-Taguimdje, S. L., Fosso Wamba, S., Kala Kamdjoug, J. R., & Tchatchouang Wanko, C. E. (2020). Influence of artificial intelligence (AI) on firm performance: the business value of AI-based transformation projects. Business Process Management Journal, 26(7), 1893–1924. [Google Scholar] [Crossref]
37. Sarkar, D., Bali, R., & Sharma, T. (2018). Machine Learning Basics. In Practical Machine Learning with Python (pp. 3–65). [Google Scholar] [Crossref]
38. Hong, T., Wang, Z., Luo, X., & Zhang, W. (2020). State-of-the-art on research and applications of machine learning in the building life cycle. In Energy and Buildings (Vol. 212). Elsevier Ltd. [Google Scholar] [Crossref]
39. Abdulfattah, B. S., Abdelsalam, H. A., Abdelsalam, M., Bolpagni, M., Thurairajah, N., Perez, L. F., & Butt, T. E. (2023). Predicting implications of design changes in BIM-based construction projects through machine learning. Automation in Construction, 155, 105057. [Google Scholar] [Crossref]
40. Pilehchian, B., Staub-French, S., & Nepal, M. P. (2015). A conceptual approach to track design changes within a multi-disciplinary building information modeling environment. Canadian Journal of Civil Engineering, 42(2), 139–152. [Google Scholar] [Crossref]
Metrics
Views & Downloads
Similar Articles
- Project Management Approaches to Improving Educational Outcomes in Public Schools: A Study of Selected Public Schools in Lagos State
- Project Management Practices and the Effectiveness of Polio Emergency Operations Centres in Nigeria: Evidence from Damaturu, Yobe State.
- Assessing the Extent of Deployment of Integrated Project Delivery (IPD) on Construction Project.