Analysis of Critical Path Method (CPM) To Optimized Project Scheduling
Authors
Ogun State Institute of Technology, Igbesa, Ogun State (Nigeria)
Ogun State Institute of Technology, Igbesa, Ogun State (Nigeria)
Article Information
DOI: 10.51584/IJRIAS.2026.11020008
Subject Category: Applied Mathematics
Volume/Issue: 11/2 | Page No: 87-93
Publication Timeline
Submitted: 2026-02-11
Accepted: 2026-02-23
Published: 2026-02-14
Abstract
Network analysis makes use of critical path method to effectively manage and execute projects. Every project must be properly planned, scheduled and its completion time accurately estimated. As a result critical path method (CPM) is useful tool in project management and scheduling. This study employed critical path method to estimate the duration of a project in a building construction project using a case study of KLM Building Firm. The research design adopted was analytical, as it was suitable for the nature of the work. Secondary data on project activities were obtained from the construction site and used for the analysis. The (TORA) software were used to run the analysis. The result shows that the CPM is high efficient in estimating project completion time. The initial completion time of 45 weeks were reduced to 31 weeks by applying the CPM techniques. Based on this findings, it is recommended that management adopt CPM for proper decision-making, as its helps to save labour cost, reduce project during and increase organizational productivity.
Keywords
Critical path, Project Management, Scheduling, Earliest, Events, Latest Events
Downloads
References
1. A.M. Aliyu, (2022). “Use of CPM in project management: A pragmatic study, “Global Journal of Pure and Applied Science, Vol. 18, No.3, Pp. 197-206. [Google Scholar] [Crossref]
2. Atin S. and Lubis R. (2019): Implementation of critical path method in project planning and scheduling IOP Conferences series material science Engineering: Publishing 662022031. [Google Scholar] [Crossref]
3. Danfalani, Usman Bitrus, Mohammed Mijin yawa, Reuben, B.Z. Joshua Auche Yakubu, Shamsudeen Iya Digil; (2023): Application of critical path method (CPM) To optimal project scheduling: A case of Mosul Building Company, Yola North Local Government Adamawa State, Nigeria FUDMA Journal of Sciences pg. 186-192. [Google Scholar] [Crossref]
4. Karibo Benaiah Bagshow (2021): PERT and CPM in project management with practical example. American Journal of operations Research, Issue 11, pg. 215-226. [Google Scholar] [Crossref]
5. Khaled Abuhasel (2023): Sustainable Green City Development Project analysis using the critical path method (CPM) and the crashing project method on Time and cost optimization. Journal of Engineering, Technology and Applied Science Research Vol. 13, No. 3, 2023, 10973-10977. [Google Scholar] [Crossref]
6. Maduagu, E.N. (2022). Critical path method (CPM) Network as a tool for effective project execution in some selected construction firms in Enugu state. Marketing and management sciences: European Journal of managements science volume 5, ISSN: 2263-6684 Impact factor: 3.426. [Google Scholar] [Crossref]
7. Orumie Ukamaka Cynthia (2020): “Implementation of project Evaluation and Review Techniques (PERT) and critical path method (CPM): A comparative study”. International journal of industrial and operations Research DOI: 10.35840/263-8947/650. [Google Scholar] [Crossref]
8. S. Atin & R. Lubis (2019): Implementation of Critical Path Method in Project Planning and Scheduling INCT TEST. IOP conference series: Material science and Engineering 662 [Google Scholar] [Crossref]
9. Solaja, O. Abiodun, J. Abioro M. Ekpudu, J. Olasubulumi, O. (2019): Application of linear programming techniques in production planning international. Journal of Applied Operation Research – An open access Journal; 9(3): 11-19. [Google Scholar] [Crossref]
10. Wallace Agyei (2019): “Project Planning and Scheduling using PERT and CPM Techniques with linear programs” International Journal of Scientific and Technology research volume 4, issue 8, Pp. 222-227. [Google Scholar] [Crossref]
Metrics
Views & Downloads
Similar Articles
- Applied Partial Differential Equation Modeling of Grating-Based Devices for Enhanced Sensing and Monitoring in the Petroleum and Gas Industry
- Boussinesq Navier Stokes to A Modification on the Lorenz-63 Model
- Evaluating Time-Series Models for Dengue Haemorrhagic Fever Prediction: Arima vs. Sarima and Exponential Smoothing