Building Maintenance Information System Using 4D Bim Technology for Campus Facilities at Uniciti Alam, Universiti Malaysia Perlis
Authors
Faculty of Civil Engineering & Technology, Universiti Malaysia Perlis (UniMAP),Arau, Perlis (Malaysia)
Faculty of Civil Engineering & Technology, Universiti Malaysia Perlis (UniMAP),Arau, Perlis;Centre for Real Estate Studies (CRES), Universiti Teknologi Malaysia (UTM), Skudai, Johor (Malaysia)
Faculty of Civil Engineering & Technology, Universiti Malaysia Perlis (UniMAP),Arau, Perlis (Malaysia)
Faculty of Civil Engineering & Technology, Universiti Malaysia Perlis (UniMAP),Arau, Perlis (Malaysia)
Faculty of Civil Engineering & Technology, Universiti Malaysia Perlis (UniMAP),Arau, Perlis (Malaysia)
Article Information
DOI: 10.47772/IJRISS.2026.10230010
Subject Category: Civil Engineering
Volume/Issue: 10/23 | Page No: 116-136
Publication Timeline
Submitted: 2026-05-08
Accepted: 2026-05-14
Published: 2026-05-28
Abstract
Building maintenance encompasses the activities aimed at preserving and restoring a building's and facility's functionality, representing a globally demanding process. Effective maintenance management is crucial for the prolonged use of buildings, ensuring their preservation and promoting health and safety. Traditionally, the paper-based method of managing maintenance, which assigns priorities to each defect, including building amenities, has been associated with various issues such as inadequate maintenance, limited funding, poor services and maintenance backlogs. This study focuses on Block A3 of the Uniciti Alam Campus, University Malaysia Perlis, as a case study to explore best practices in maintenance management. The goal is to propose a new building maintenance information system utilizing Revit and Naviswork Manage software, aiming to enhance the existing maintenance management system. The study also aims to identify and compare issues related to maintenance management between the traditional paper-based method and Building Information Modelling (BIM). The proposed system improvement is intended for implementation in UniMAP's maintenance management system. Research methods employed include literature review and semi-structure interviews to gather relevant data, while Revit and Naviswork Manage software are utilized for research purposes. The anticipated outcome of this research is the improved efficiency of the maintenance management system through the implementation of the BIM method. It is expected to be a beneficial technology aiding staff and owners in addressing maintenance issues, particularly at the Uniciti Alam campus of UniMAP.
Keywords
Building Information Modelling; Building Maintenance; Facility Maintenance; 4D BIM Technology.
Downloads
References
1. Aziz, N. D., Nawawi, A. H., & Ariff, N. R. M. (2016). Building Information Modelling (BIM) in Facilities Management: Opportunities to be Considered by Facility Managers. Procedia - Social and Behavioral Sciences, 234, 353–362. https://doi.org/10.1016/j.sbspro.2016.10.252 [Google Scholar] [Crossref]
2. Bernama. (2023, June 20). Public Works Ministry aiming to maximise use of IBS, BIM in construction sector. [Google Scholar] [Crossref]
3. https://www.edgeprop.my/content/1906410/public-works-ministry-aiming-maximise-use-ibs-bim-construction-sector [Google Scholar] [Crossref]
4. Chen, J., Lu, W., Fu, Y., & Dong, Z. (2023). Automated facility inspection using robotics and BIM: A knowledge-driven approach. Advanced Engineering Informatics, 55, 101838. [Google Scholar] [Crossref]
5. https://doi.org/10.1016/j.aei.2022.101838 [Google Scholar] [Crossref]
6. Faqih, F., & Zayed, T. (2021). Defect-based building condition assessment. Building and Environment, 191, 107575. https://doi.org/10.1016/j.buildenv.2020.107575 [Google Scholar] [Crossref]
7. Firdaus Razali, M., Azam Haron, N., Hassim, S., Hizami Alias, A., Nahar Harun, A., & Salihu Abubakar, A. (2019). A Review: Application of Building Information Modelling (BIM) over Building Life Cycles. IOP Conference Series: Earth and Environmental Science, 357(1), 012028. [Google Scholar] [Crossref]
8. https://doi.org/10.1088/1755-1315/357/1/012028 [Google Scholar] [Crossref]
9. Gao, X., & Pishdad-Bozorgi, P. (2019). BIM-enabled facilities operation and maintenance: A review. Advanced Engineering Informatics, 39, 227–247. https://doi.org/10.1016/j.aei.2019.01.005 [Google Scholar] [Crossref]
10. Gong, P., Zeng, N., Ye, K., & König, M. (2019). An Empirical Study on the Acceptance of 4D BIM in EPC Projects in China. Sustainability, 11(5), 1316. https://doi.org/10.3390/su11051316 [Google Scholar] [Crossref]
11. Hamil, S. (2021, September 9). BIM dimensions – 3D, 4D, 5D, 6D BIM explained. https://www.thenbs.com/knowledge/bim-dimensions-3d-4d-5d-6d-bim-explained [Google Scholar] [Crossref]
12. Hoang, G. V., Vu, D. K. T., Le, N. H., & Nguyen, T. P. (2020). Benefits and challenges of BIM implementation for facility management in operation and maintenance face of buildings in Vietnam. IOP Conference Series: Materials Science and Engineering, 869(2), 022032. [Google Scholar] [Crossref]
13. https://doi.org/10.1088/1757-899X/869/2/022032 [Google Scholar] [Crossref]
14. Ismail, Z.-A. B. (2021). Towards a BIM-based approach for improving maintenance performance in IBS building projects. Engineering, Construction and Architectural Management, 28(5), 1468–1490. https://doi.org/10.1108/ECAM-07-2020-0508 [Google Scholar] [Crossref]
15. Li, S., Zhang, Z., Lin, D., Zhang, T., & Han, L. (2023). Development of a BIM-based bridge maintenance system (BMS) for managing defect data. Scientific Reports, 13(1), 846. [Google Scholar] [Crossref]
16. https://doi.org/10.1038/s41598-023-27924-6 [Google Scholar] [Crossref]
17. Matarneh, S. T., Danso-Amoako, M., Al-Bizri, S., Gaterell, M., & Matarneh, R. (2019). Building information modeling for facilities management: A literature review and future research directions. Journal of Building Engineering, 24, 100755. https://doi.org/10.1016/j.jobe.2019.100755 [Google Scholar] [Crossref]
18. Oluleye, I. B., Oyetunji, A. K., Olukolajo, M. A., & Chan, D. W. M. (2023). Integrating building information modelling for improving facility management operations: A fuzzy synthetic evaluation of the critical success factors. Journal of Facilities Management, 21(2), 201–220. [Google Scholar] [Crossref]
19. https://doi.org/10.1108/JFM-06-2021-0066 [Google Scholar] [Crossref]
20. Ruslin, Mashuri, S., Abdul Rasak, M. S., Alhabsyi, F., & Syam, H. (2022). Semi-structured Interview: A Methodological Reflection on the Development of a Qualitative Research Instrument in Educational Studies. [Google Scholar] [Crossref]
21. Shaikh, Y., Sawant, V., Satam, A., Waingankar, H., & Joshi, D. M. (2020). REVIT STRUCTURE. International Journal of Architectural Design and Management. https://doi.org/10.37628/.v3i2.707 [Google Scholar] [Crossref]
22. Teicholz, P. M., & International Facility Management Association (Eds.). (2013). BIM for facility managers. John Wiley & Sons [u.a.]. [Google Scholar] [Crossref]
23. Tengku Ahmad, T. N., & Abd Rasid, S. Z. (2021). Implementation of Building Maintenance Management System in an Organization. Journal of Advanced Research in Technology and Innovation Management 1, Issue 1 (2021) 1-8. [Google Scholar] [Crossref]
24. Yalcinkaya, M., & Singh, V. (2014). Building Information Modeling (BIM) for Facilities Management – Literature Review and Future Needs. In S. Fukuda, A. Bernard, B. Gurumoorthy, & A. Bouras (Eds.), Product Lifecycle Management for a Global Market (Vol. 442, pp. 1–10). Springer Berlin Heidelberg. https://doi.org/10.1007/978-3-662-45937-9_1 [Google Scholar] [Crossref]
25. Espindola, D. B., Fumagalli, L., Garetti, M., Pereira, C. E., Botelho, S. S. C. and Henriques, R. V. (2013), “A Model-based Approach for Data Integration to Improve Maintenance Management by Mixed Reality”, Computers in Industry, Vol. 64 No. 2013, pp. 376-391. [Google Scholar] [Crossref]
26. Miettinen, R. and Paavola, S. (2014). Beyond the BIM Utopia: Approaches to the Development and Implementation of Building Information Modeling, Automation in Construction, Vol. 43 No. 2014, pp. 84-91. [Google Scholar] [Crossref]
27. Kapoor, D. R. and Saigal, P. (2013). Research Methodology: Methods and Techniques, REGAL Publications, New Delhi, India. [Google Scholar] [Crossref]
28. Hesse-Biber, S. N. and Leavy, P. (2011), The Practice of Qualitative Research, SAGE Publications, Thousand Oaks, California. [Google Scholar] [Crossref]
29. Tainton, B. E. (1990). The Unit of Analysis ‘Problem’ in Educational Research, Journal of Educational Research, Vol. 6 No. 1, pp. 4-19. [Google Scholar] [Crossref]
30. Gnanarednam, M. and Jayasena, H. S. (2013). Ability of BIM to Satisfy CAFM Information Requirements, in The Second World Construction Symposium 2013: Socio-Economic Sustainability in Construction, Ceylon Institute of Builders, Colombo, Sri Lanka, pp. 12-21. [Google Scholar] [Crossref]
31. Liu, R. and Issa, R. (2012). Automatically Updating Maintenance Information from a BIM Database, in International Conference on Computing in Civil Engineering, ASCE, Florida, USA, pp. 373-380. [Google Scholar] [Crossref]
32. Costin, A., Shaak, A. and Teizer, J. 2013. Development of a Navigational Algorithm in BIM for Effective Utility Maintenance Management of Facilities Equipped with Passive RFID. In 2013 International Workshop on Computing in Civil Engineering, Los Angeles, California, ASCE, Florida, USA, pp. 653-661. [Google Scholar] [Crossref]
33. Chen, H., Hou, C. and Wang, Y. (2013). A 3D Visualized Expert System for Maintenance and Management of Existing Building Facilities using Reliability-based Method, Expert Systems with Applications, Vol. 40 No. 2013, pp. 287-299. [Google Scholar] [Crossref]
34. Kwon, O., Park, C. and Lim, C. (2014). A Defect Management System for Reinforced Concrete Work Utilizing BIM, Image-Matching and Augmented Reality, Automation in Construction, Vol. 46 No. 2014, pp. 74-81. [Google Scholar] [Crossref]
Metrics
Views & Downloads
Similar Articles
- Hysteresis Behaviour and Energy Dissipation of Niger Delta Soil under Cyclic Loading Conditions
- Exploring Bamboo Leaf Ash as Supplementary Cementitious Material for Enhanced Performance in Compressive and Tension in Mortar Strength as Construction Materials
- Effect of Using a Combination of 50% Coal Dust 50 % Course Sand as Filler in Bituminous Mix Design
- A Review of the Current State of Lean Construction in Nairobi City County
- Adaptation of Crumb Rubber Modified Asphalt Predictive Models for Nigerian Climatic Conditions: A Transfer Learning Approach