Cash-Flow Planning and Public Infrastructure Project Performance: Evidence from the Uganda National Roads Authority

Authors

Geoffrey Karyeija

Universal Technology and Management University, Uganda (Uganda)

Dr. J. M. O. Tukei

Universal Technology and Management University, Uganda (Uganda)

C. D. Alupo

Uganda Revenue Authority, Uganda (Uganda)

L. Tukei

Uganda Capital Markets Authority, Uganda (Uganda)

E. R. Ayait

Uganda Police Force, Uganda (Uganda)

Article Information

DOI: 10.47772/IJRISS.2026.101100001

Subject Category: Project Management

Volume/Issue: 10/11 | Page No: 1-21

Publication Timeline

Submitted: 2026-10-15

Accepted: 2026-11-02

Published: 2026-11-21

Abstract

Public infrastructure projects may be technically viable, contractually approved and adequately budgeted, yet still experience implementation difficulties when financial resources are not available at the time project obligations fall due. This distinction between budgetary provision and actual liquidity is particularly important in large public infrastructure projects, where implementation depends on the continuous coordination of engineering activities, procurement processes, contractual commitments and financial releases. Against this background, this study examined the relationship between cash-flow planning and the implementation of public infrastructure projects at the Uganda National Roads Authority (UNRA).
The article was derived from a convergent mixed-methods study involving 78 questionnaire respondents, 10 key informants and documentary evidence obtained from ten substantially completed infrastructure projects. Quantitative data were analysed using descriptive statistics, Pearson’s correlation coefficient and simple linear regression, while qualitative evidence was analysed thematically to explain and contextualise the observed statistical patterns.
The findings revealed an important institutional contradiction. Respondents generally acknowledged the existence of infrastructure expenditure commitments, planning policies and cash-flow regulations. However, comparatively weaker ratings were reported regarding personnel understanding of budgeting processes, preparation of annual financial plans, stakeholder involvement, open communication of cash-flow plans and dissemination of information concerning funding sources. Cash-flow planning was positively and significantly related to infrastructure-project implementation (r = .617, p < .01). Regression analysis further demonstrated that cash-flow planning significantly predicted project implementation (β = .617, p < .001), accounting for 38.0% of the observed variance in implementation outcomes (R² = .380).
The findings indicate that cash-flow planning should not be understood narrowly as an accounting procedure. Rather, it constitutes an integrated project-management capability through which funding requirements are aligned with construction schedules, procurement obligations, payment milestones, contractual commitments and implementation priorities. The article concludes that stronger forecasting, wider stakeholder participation, improved budgeting competence, integrated information systems, transparent communication and regular revision of cash-flow plans are necessary to reduce financial disruption, implementation delays and cost escalation in public infrastructure projects.

Keywords

cash-flow planning; public infrastructure; project implementation; financial forecasting; project performance; UNRA; Uganda

Downloads

References

1. Creswell, J. W., & Creswell, J. D. (2018). Research design: Qualitative, quantitative, and mixed methods approaches (5th ed.). SAGE Publications. [Google Scholar] [Crossref]

2. Ggoobi, R., Lukwago, D., & Bogere, G. (2020). Public expenditure governance in the roads sector. Advocates Coalition for Development and Environment. [Google Scholar] [Crossref]

3. Ika, L. A., & Pinto, J. K. (2022). The “re-meaning” of project success: Updating and recalibrating for modern project management. International Journal of Project Management, 40(7), 835–848. https://doi.org/10.1016/j.ijproman.2022.08.001 [Google Scholar] [Crossref]

4. Majumder, S., Majumder, S., & Biswas, D. (2022). Impact of effective construction planning in project performance improvement. Quality & Quantity, 56(1). https://doi.org/10.1007/s11135-021-01224-5 [Google Scholar] [Crossref]

5. Makridakis, S. (1996). Forecasting: Its role and value for planning and strategy. International Journal of Forecasting, 12(4), 513–537. https://doi.org/10.1016/S0169-2070(96)00677-2 [Google Scholar] [Crossref]

6. Muzaale, T., & Auriacombe, C. J. (2018). Policy challenges to road infrastructure projects performance: Trends, issues and concerns in Uganda. African Journal of Public Affairs, 10(3), 134–154. [Google Scholar] [Crossref]

7. Nawaf, M. A.-N. (2022). The effect of cash flow variation on project performance: An empirical study from Kuwait. The Journal of Asian Finance, Economics and Business, 9(3), 53–63. https://doi.org/10.13106/jafeb.2022.vol9.no3.0053 [Google Scholar] [Crossref]

8. Ochary, J. (2016). Factors influencing time and cost overruns on construction projects in Uganda [Unpublished master’s thesis]. Islamic University in Uganda. [Google Scholar] [Crossref]

9. Public Finance Management Act, 2015. (2015). Uganda Printing and Publishing Corporation. [Google Scholar] [Crossref]

10. Royal Institution of Chartered Surveyors. (2014). Cash flow forecasting. RICS. [Google Scholar] [Crossref]

11. Tripathi, A., & Gardner, J. (2016). Strengthening cash management [Technical assistance report]. International Monetary Fund. [Google Scholar] [Crossref]

12. Uganda National Roads Authority. (2020). UNRA corporate strategic plan 2020/21–2024/25. UNRA. [Google Scholar] [Crossref]

13. Uganda National Roads Authority. (2021/2022). Annual performance report. UNRA. [Google Scholar] [Crossref]

14. Uganda National Roads Authority. (2022). Project status report. UNRA. [Google Scholar] [Crossref]

15. Zohrabi, M. (2013). Mixed method research: Instruments, validity, reliability and reporting findings. Theory and Practice in Language Studies, 3(2), 254–262. https://doi.org/10.4304/tpls.3.2.254-262 [Google Scholar] [Crossref]