Comparative Analysis Between Reengineering and Continuous Improvement in the Textile Sector

Authors

Alamilla García Alan Johan

Industrial Engineering, Instituto Tecnológico de Pachuca (Tecnológico Nacional de México), Pachuca, Hidalgo (Mexico)

Liliana González García

Industrial Engineering, Instituto Tecnológico de Pachuca (Tecnológico Nacional de México), Pachuca, Hidalgo (Mexico)

González García Liliana

Industrial Engineering, Instituto Tecnológico de Pachuca (Tecnológico Nacional de México), Pachuca, Hidalgo (Mexico)

Montiel Hernadez Christian

Industrial Engineering, Instituto Tecnológico de Pachuca (Tecnológico Nacional de México), Pachuca, Hidalgo (Mexico)

Pérez Pérez Ana Italia

Industrial Engineering, Instituto Tecnológico de Pachuca (Tecnológico Nacional de México), Pachuca, Hidalgo (Mexico)

Urrutia Muñoz Montserrat

Industrial Engineering, Instituto Tecnológico de Pachuca (Tecnológico Nacional de México), Pachuca, Hidalgo (Mexico)

Article Information

DOI: 10.47772/IJRISS.2026.102500054

Subject Category: Engineering & Technology

Volume/Issue: 10/25 | Page No: 843-855

Publication Timeline

Submitted: 2026-11-11

Accepted: 2026-11-16

Published: 2026-11-25

Abstract

This research addresses a common problem in manufacturing operations management: the difficulty that companies face when selecting between two process improvement strategies, continuous improvement and business process reengineering. Frequently, organizations choose inadequate solutions, leading to unnecessary costs, organizational resistance, or limited results. To solve this problem, the study proposes and validates a multicriteria decision matrix that integrates statistical process capability indicators (Cp and Cpk), qualitative organizational variables (maturity, resource availability, strategic impact), and a traffic light system (green, yellow, red zones) to determine the most suitable strategy. The matrix was applied in a case study at PESA Uniformes S.A. de C.V., a company dedicated to the production of industrial fabrics and uniforms, specifically in the textile finishing process in the state of Hidalgo, Mexico. Results showed a statistically capable process (Cp = 2.04, Cpk = 2.01) that was well-centered, leading to the recommendation of a continuous improvement strategy rather than a costly reengineering. The comparative economic analysis demonstrated estimated savings of 1,032,000 MXN by avoiding unnecessary investments, as well as a reduction in material waste from 3.2% to 2.4%, equivalent to monthly savings of approximately 39,000 MXN. The research is further justified by the economic relevance of the textile sector in Hidalgo, which ranks fourth nationally according to the Monthly Industrial Activity Index by Federal Entity (IMAIEF) published by INEGI (February 2026). It is concluded that the proposed matrix constitutes an objective, low-cost, and easy-to-implement tool that reduces uncertainty in strategic decision-making and contributes to strengthening the competitiveness of the Mexican textile industry.

Keywords

continuous improvement, business process reengineering, multicriteria decision matrix, process capability (Cp, Cpk), textile industry

Downloads

References

1. Deming, W. E. (1986). Out of the crisis. MIT Press. [Google Scholar] [Crossref]

2. Hammer, M., & Champy, J. (1993). Reengineering the corporation. HarperBusiness. [Google Scholar] [Crossref]

3. Harry, M., & Schroeder, R. (2000). Six Sigma: The breakthrough management strategy revolutionizing the world’s top corporations. Currency. [Google Scholar] [Crossref]

4. Hernández Sampieri, R., Fernández Collado, C., & Baptista Lucio, P. (2014). Metodología de la investigación. McGraw-Hill. [Google Scholar] [Crossref]

5. Hessing, T. (2014, September 10). Process capability (Cp & Cpk). Six Sigma Study Guide. https://sixsigmastudyguide.com/process-capability-cp-cpk/ [Google Scholar] [Crossref]

6. Imai, M. (1986). Kaizen: The key to Japan’s competitive success. McGraw-Hill. [Google Scholar] [Crossref]

7. Instituto Nacional de Estadística y Geografía. (2026). INEGI. https://www.inegi.org.mx [Google Scholar] [Crossref]

8. Montgomery, D. C. (2013). Introduction to statistical quality control (7th ed.). Wiley. [Google Scholar] [Crossref]

9. National Institute of Standards and Technology. (2026). 6.1.6. What is process capability? https://www.itl.nist.gov/div898/handbook/pmc/section1/pmc16.htm [Google Scholar] [Crossref]

10. Pande, P. S., Neuman, R. P., & Cavanagh, R. R. (2002). The Six Sigma way. McGraw-Hill. [Google Scholar] [Crossref]

11. Porter, M. E. (1985). Ventaja competitiva: Creación y sostenimiento de un desempeño superior. Free Press. [Google Scholar] [Crossref]

12. Womack, J. P., & Jones, D. T. (1996). Lean thinking: Banish waste and create wealth in your corporation. Simon & Schuster. [Google Scholar] [Crossref]

Metrics

Views & Downloads

Similar Articles