Stage-Gates, Pull Planning, and KPIs for the Reduction of Rework in Commercial Space Management
Authors
Cristi Lucero Maldonado Alvarado
Instituto Tecnológico de Pachuca, Hidalgo, Mexico (Mexico)
Instituto Tecnológico de Pachuca, Hidalgo, Mexico (Mexico)
Enrique de Jesús Mohedano Torres
Instituto Tecnológico de Pachuca, Hidalgo, Mexico (Mexico)
Instituto Tecnológico de Pachuca, Hidalgo, Mexico (Mexico)
Instituto Tecnológico de Pachuca, Hidalgo, Mexico (Mexico)
Instituto Tecnológico de Pachuca, Hidalgo, Mexico (Mexico)
Article Information
DOI: 10.47772/IJRISS.2026.102500034
Subject Category: Project Management
Volume/Issue: 10/25 | Page No: 545-556
Publication Timeline
Submitted: 2026-10-26
Accepted: 2026-10-31
Published: 2026-11-24
Abstract
The retail shopfitting industry operates under intense pressure from fixed commercial opening dates, high client variability, and fragmented information flows between design, manufacturing, and site installation. These conditions frequently result in documentation errors and on-site rework, which historically accounted for 68 % of operational impact in technical offices. This study designs and validates a hybrid methodology that integrates Concurrent Engineering principles with Lean Construction tools to improve the traceability of client requirements and reduce rework in commercial space management. The approach was structured around four sequential phases Planning, Detailed Engineering and Document Control, Execution and On-Site Assembly, and Closure and Evaluation and operationalized through stage-gates, reverse pull planning, technical checklists, change-control boards, and four key performance indicators: Percentage of Plan Complete (PPC), Technical Deliverables Quality Index (ICET), Person-Days Deviation Index, and Site Incidence Index (IIS).
Validation was conducted through partial implementation in the pilot project of the Oysho Ánima Los Cabos store. Results showed a PPC of 71.43 %, an ICET of 81 %, a person-days deviation of +9.38 %, and a global IIS of 14.38 %. Five of the seven furniture families recorded zero incidences, and 85.7 % of all site non-conformities were traced to inadequate packing of an imported batch rather than local design or manufacturing failures. The methodology made external variability visible, filtered documentation errors before production, protected the fixed opening date, and generated organizational learning without requiring costly enterprise systems.
The findings demonstrate that a low-cost, visually managed hybrid framework is practical and effective for professionalizing technical offices in the retail fixture sector. The study contributes an applied model adapted to high-variability commercial environments and provides a foundation for multi-project replication and longitudinal measurement of warranty reduction.
Keywords
stage-gates, pull planning, Lean Construction, Concurrent Engineering, retail shopfitting, rework reduction, key performance indicators, technical traceability
Downloads
References
1. Ballard, G. (2000). The Last Planner System of Lean Construction (Doctoral dissertation, University of Birmingham). British Library ETHOS. [Google Scholar] [Crossref]
2. Bicheno, J. (2012). The Lean Toolbox for Service and Lean Office (5th ed.). PICSIE Books. [Google Scholar] [Crossref]
3. Cabrera Huaycochea, A. J. (2026). Implementación del Last Planner System en un proyecto industrial de almacenamiento y comercialización en Lima Metropolitana [Master’s thesis, Pontificia Universidad Católica del Perú]. Repositorio PUCP. [Google Scholar] [Crossref]
4. Cooper, R. G. (2016). Agile–stage-gate hybrids: The next stage for new product development. Research-Technology Management, 59(1), 21–29. https://doi.org/10.1080/08956308.2016.1117317 [Google Scholar] [Crossref]
5. Evans, J. R., & Lindsay, W. M. (2015). Administración y control de la calidad (9th ed.). Cengage Learning. [Google Scholar] [Crossref]
6. Hamerski, D. C., Formoso, C. T., Isatto, E. L., & Cevallos, C. A. (2019). Combining Lean and Agile project management in a multi-project environment: Case study in a retail company. In Proceedings of the 27th Annual Conference of the International Group for Lean Construction (IGLC) (pp. 239–250). https://doi.org/10.24928/2019/0217 [Google Scholar] [Crossref]
7. Howell, G. A. (1999). What is Lean Construction – 1999. In Proceedings of the 7th Annual Conference of the International Group for Lean Construction (IGLC) (pp. 1–10). [Google Scholar] [Crossref]
8. Koskela, L. (1992). Application of the new production philosophy to construction (Technical Report No. 72). Center for Integrated Facility Engineering, Stanford University. [Google Scholar] [Crossref]
9. Lean Construction México. (2026). PPC en Last Planner System: cómo medirlo y mejorarlo. https://www.leanconstructionmexico.com.mx [Google Scholar] [Crossref]
10. Liker, J. K. (2004). The Toyota way: 14 management principles from the world’s greatest manufacturer. McGraw-Hill. [Google Scholar] [Crossref]
11. Love, P. E. D., Smith, J., Ackermann, F., Irani, Z., & Teo, P. (2018). The costs of rework: Insights from construction and opportunities for learning. Production Planning & Control, 29(13), 1082–1095. https://doi.org/10.1080/09537287.2018.1513177 [Google Scholar] [Crossref]
12. Mayo-Alvarez, L., Apaza-Surco, Á., Quispe-Bellido, W., & Paredes-Soria, J. (2026). Critical factors in the implementation of Lean Construction: A literature review 2015–2025. Buildings, 16(4), 825. https://doi.org/10.3390/buildings16040825 [Google Scholar] [Crossref]
13. Mesher, L. (2010). Diseño de espacios comerciales: Retail design. Gustavo Gili. [Google Scholar] [Crossref]
14. Page, M. J., McKenzie, J. E., Bossuyt, P. M., Boutron, I., Hoffmann, T. C., Mulrow, C. D., Shamseer, L., Tetzlaff, J. M., Akl, E. A., Brennan, S. E., Chou, R., Glanville, J., Grimshaw, J. M., Hróbjartsson, A., Lalu, M. M., Li, T., Loder, E. W., Mayo-Wilson, E., McDonald, S., … Moher, D. (2021). The PRISMA 2020 statement: An updated guideline for reporting systematic reviews. BMJ, 372, n71. https://doi.org/10.1136/bmj.n71 [Google Scholar] [Crossref]
15. Pons, J. F., & Rubio, I. (2019). Lean Construction: Las 10 claves del éxito para su implantación. Consejo General de la Arquitectura Técnica de España. [Google Scholar] [Crossref]
16. Project Management Institute. (2021). A guide to the project management body of knowledge (PMBOK guide) (7th ed.). Project Management Institute. [Google Scholar] [Crossref]
17. Riba, C., & Molina, A. (2006). Ingeniería concurrente: Una metodología de integración. Edicions UPC. [Google Scholar] [Crossref]
18. Shingo, S. (1986). Zero quality control: Source inspection and the Poka-Yoke system. Productivity Press. [Google Scholar] [Crossref]
Metrics
Views & Downloads
Similar Articles
- Project Management Approaches to Improving Educational Outcomes in Public Schools: A Study of Selected Public Schools in Lagos State
- Project Management Practices and the Effectiveness of Polio Emergency Operations Centres in Nigeria: Evidence from Damaturu, Yobe State.
- A Conceptual Framework for Construction Delay Management Integrating Project and Weather Factors
- Assessing the Extent of Deployment of Integrated Project Delivery (IPD) on Construction Project.
- Cash-Flow Planning and Public Infrastructure Project Performance: Evidence from the Uganda National Roads Authority