What Matters for Immovable Asset Data Quality? Evidence from Malaysian Asset Management Practitioners
Authors
Integrated Asset Management Branch, Public Works Department of Malaysia (Malaysia)
Studies Centre of Diplomas Management Department UTMSPACE Malaysia (Malaysia)
Integrated Asset Management Branch, Public Works Department of Malaysia (Malaysia)
Article Information
DOI: 10.47772/IJRISS.2026.101000642
Subject Category: Immovable Asset Data Quality
Volume/Issue: 10/10 | Page No: 8937-8957
Publication Timeline
Submitted: 2026-10-25
Accepted: 2026-10-30
Published: 2026-11-13
Abstract
Reliable asset information is central to immovable asset management, yet the relationship between organizational priorities and data quality priorities requires empirical clarification. This study examines associations between the importance practitioners assign to People, Technology and Process factors and the importance they assign to eleven immovable asset data quality dimensions. A cross-sectional survey yielded 274 responses from Malaysian practitioners recruited through asset management workshops. Reflective partial least squares path modelling was independently reproduced from the survey export, with uncertainty assessed using 10,000 case-bootstrap resamples and two sensitivity analyses. All item means exceeded 4.00 on the five-point importance scale. People (β = .271), Technology (β = .297) and Process (β = .312) showed positive associations with data quality importance, with all 95% percentile confidence intervals excluding zero. The model accounted for 68.8% of the variance in the endogenous importance score. However, Technology and Process were not adequately distinguished (HTMT = .957), and coefficient ordering changed under sensitivity analysis. The findings provide exploratory evidence of connected practitioner priorities rather than independently validated effects on achieved data quality. The study extends empirical examination of the People–Process–Technology framework and identifies measurement boundaries requiring refinement. Practical application should combine stakeholder priorities with independent record audits and evidence of organizational implementation
Keywords
Immovable Asset Data Quality, Immovable Asset Management, Digital Transformation Public Sector Asset Management; Asset Information Management; Data Governance
Downloads
References
1. Abideen, D. K., Yunusa-Kaltungo, A., Cheung, C., & Manu, P. (2024). Key information requirements for integrating building information modelling with operations and maintenance: A Delphi approach. Journal of Building Engineering, 98, Article 111445. https://doi.org/10.1016/j.jobe.2024.111445 [Google Scholar] [Crossref]
2. Abraham, R., Schneider, J., & vom Brocke, J. (2019). Data governance: A conceptual framework, structured review, and research agenda. International Journal of Information Management, 49, 424–438. https://doi.org/10.1016/j.ijinfomgt.2019.07.008 [Google Scholar] [Crossref]
3. Chang, J. Y., Merino-Garcia, J., Xie, X., Moretti, N., & Parlikad, A. (2022). Information quality for effective asset management: A literature review. IFAC-PapersOnLine, 55(19), 235–240.https://doi.org/10.1016/j.ifacol.2022.09.213 [Google Scholar] [Crossref]
4. Clegg, C. W. (2000). Sociotechnical principles for system design. Applied Ergonomics, 31(5), 463–477. https://doi.org/10.1016/S0003-6870(00)00009-0 [Google Scholar] [Crossref]
5. Coltman, T., Devinney, T. M., Midgley, D. F., & Venaik, S. (2008). Formative versus reflective measurement models: Two applications of formative measurement. Journal of Business Research, 61(12), 1250–1262. https://doi.org/10.1016/j.jbusres.2008.01.013 [Google Scholar] [Crossref]
6. Fang, Z., Liu, Y., Lu, Q., Pitt, M., Hanna, S., & Tian, Z. (2022). BIM-integrated portfolio-based strategic asset data quality management. Automation in Construction, 134, Article 104070.https://doi.org/10.1016/j.autcon.2021.104070 [Google Scholar] [Crossref]
7. Hair, J. F., Risher, J. J., Sarstedt, M., & Ringle, C. M. (2019). When to use and how to report the results of PLS-SEM. European Business Review, 31(1), 2–24. https://doi.org/10.1108/EBR-11-2018-0203 [Google Scholar] [Crossref]
8. Henseler, J., Ringle, C. M., & Sarstedt, M. (2015). A new criterion for assessing discriminant validity in variance-based structural equation modeling. Journal of the Academy of Marketing Science, 43, 115–135. https://doi.org/10.1007/s11747-014-0403-8 [Google Scholar] [Crossref]
9. Khatri, V., & Brown, C. V. (2010). Designing data governance. Communications of the ACM, 53(1), 148–152. https://doi.org/10.1145/1629175.1629210 [Google Scholar] [Crossref]
10. Konanahalli, A., Marinelli, M., & Oyedele, L. (2022). Drivers and challenges associated with the implementation of big data within U.K. facilities management sector: An exploratory factor analysis approach. IEEE Transactions on Engineering Management, 69(4), 916–929.https://doi.org/10.1109/TEM.2019.2959914 [Google Scholar] [Crossref]
11. Lin, S., Gao, J., Koronios, A., & Chanana, V. (2007). Developing a data quality framework for asset management in engineering organisations. International Journal of Information Quality, 1(1), 100–126.https://doi.org/10.1504/IJIQ.2007.013378 [Google Scholar] [Crossref]
12. Pärn, E. A., Edwards, D. J., & Sing, M. C. P. (2017). The building information modelling trajectory in facilities management: A review. Automation in Construction, 75, 45–55.https://doi.org/10.1016/j.autcon.2016.12.003 [Google Scholar] [Crossref]
13. Subri, M. S. M., Nasaruddin, A. N., Sapri, M., Hashim, H. A., Fadil, M. M., Abd Malek, M. A., & Tee, B. T. (2025). Assessing the immovable asset data quality: The critical role of people, process, and technology across public sector. Malaysian Construction Research Journal, 24(1, Special Issue), 1–13. https://www.cream.my/data/cms/files/MCRJ%20Special%20Issue%20Volume%2024%2C%20No_1%2C%202025%287%29.pdf [Google Scholar] [Crossref]
14. Subri, M. S. M., Sapri, M., Hashim, H. A., Ayob, S. F., & Fadil, M. M. (2025). Factors influencing data quality in Malaysian public sector immovable asset management strategy. International Journal of Research and Innovation in Social Science, 9(1), 1715–1727.https://doi.org/10.47772/IJRISS.2025.9010141 [Google Scholar] [Crossref]
15. Tsay, G. S., Staub-French, S., Poirier, E., Zadeh, P., & Pottinger, R. (2023). BIM for FM: Understanding information quality issues in terms of compliance with owner’s Building Information Modeling Requirements. Frontiers in Built Environment, 9, Article 1117066.https://doi.org/10.3389/fbuil.2023.1117066 [Google Scholar] [Crossref]
16. Wang, R. Y., & Strong, D. M. (1996). Beyond accuracy: What data quality means to data consumers. Journal of Management Information Systems, 12(4), 5–33.https://doi.org/10.1080/07421222.1996.11518099 [Google Scholar] [Crossref]
17. Zadeh, P. A., Wang, G., Cavka, H. B., Staub-French, S., & Pottinger, R. (2017). Information quality assessment for facility management. Advanced Engineering Informatics, 33, 181–205.https://doi.org/10.1016/j.aei.2017.06.003 [Google Scholar] [Crossref]