The Role of Construction Management in Conflict Resolution in National Government-Funded Construction Projects in Uasin Gishu Kenya .
Authors
Ongoing Masters student (TUK), Registered and practicing Building Technologist, Construction Project Manager (Kenya)
Proffesor in Department of Construction & Property Studies, TUK, Nairobi (Kenya)
Senior Lecturer, Department of Construction and Property Studies (DCPS) (Kenya)
Article Information
DOI: 10.51244/IJRSI.2025.120800297
Subject Category: Management
Volume/Issue: 12/9 | Page No: 3276-3285
Publication Timeline
Submitted: 2025-08-29
Accepted: 2025-09-04
Published: 2025-10-07
Abstract
National government-funded (NGF) construction projects in Kenya play a crucial role in fostering infrastructure development and economic growth. However, these projects are often marred by persistent conflicts arising from poor contract management, political interference, delayed payments, land acquisition disputes, and stakeholder disagreements. These conflicts lead to project delays, cost overruns, and in extreme cases, project abandonment. This study aimed to investigate the contributing factors to conflict in national government funded construction projects. Specifically, the study sought to examine the delays in payment, variation in design, misinterpretation of designs and delays in decision making by the stakeholders involved. The study adopted a mixed-methods research design, integrating both quantitative and qualitative approaches. Quantitative data was collected through self-administered questionnaires distributed to 173 respondents drawn from a target population of 185 professionals, including project managers, architects, quantity surveyors and contractors. Qualitative data was gathered through interviews with key industry players. The research utilized descriptive statistics such as means and standard deviations, alongside inferential techniques like correlation and regression analysis to interpret the findings. The study contributed valuable insights into how the contributing factors of conflict in national government funded project in uasin Gishu. The findings informed policy makers and practitioners, government agencies, construction managers, and other stakeholders on contributing factor of conflicts in NG funded projects in Uasin Gishu. Ultimately, the study revealed that the leading causes of conflict in national government-funded construction projects were late payment of contractors (M = 4.27), poor communication among stakeholders (M = 4.14), and design changes (M = 3.89The regression model indicated a strong and significant contribution of construction management to conflict resolution (R² = 0.770, p < .001). It was concluded that targeted management strategies, particularly those emphasizing communication, stakeholder involvement, and contract clarity, are effective in minimizing conflicts
Keywords
construction management, conflicts, national government , delayed payments, variations,
Downloads
References
1. N/A [Google Scholar] [Crossref]
Metrics
Views & Downloads
Similar Articles
- The Indirect Effect of Liquidity and Activity on Company Value with Profitability as an Intervening Variable
- Effect of Financial Skills, Knowledge, and Attitude on The Financial Behaviour of Clergy
- A Decade of Review: Trends in Budget Execution and Financial Performance of Development Projects in Tanzania (2014/15-2023/24)
- The Influence of Pre-Project Planning on the Budget Absorption Rate of Public Funded Infrastructure Projects in Kenya a Comparative Case Study of Narok, Migori, and Kisii County Government Projects
- Assessment of Factors Influencing Digital Transformation in Hotels’ Facility Management in Abuja Metropolis, Nigeria