Rasch-Based Validation of Agreement and Usage Instruments for Integrated Project Quality Management Systems in Construction Projects
Authors
Department of Real Estate, Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, UTM Johor Bahru, Malaysia (Malaysia)
Department of Real Estate, Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, UTM Johor Bahru, Malaysia (Malaysia)
Department of Real Estate, Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, UTM Johor Bahru, Malaysia (Malaysia)
Department of Real Estate, Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, UTM Johor Bahru, Malaysia (Malaysia)
Department of Real Estate, Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, UTM Johor Bahru, Malaysia (Malaysia)
Article Information
DOI: 10.47772/IJRISS.2026.100600662
Subject Category: Education
Volume/Issue: 10/6 | Page No: 9480-9498
Publication Timeline
Submitted: 2026-06-14
Accepted: 2026-06-19
Published: 2026-07-01
Abstract
Integrated Project Quality Management Systems (IPQMS) require robust measurement instruments to assess how project quality processes are recognised and practised by key construction stakeholders. Although quality management systems, project quality management and integrated management systems have been widely discussed in construction research, limited empirical attention has been given to validating instruments that measure IPQMS processes across stakeholder roles. This paper validates agreement and usage instruments for IPQMS processes using the Rasch Measurement Model. The study analysed six datasets representing three stakeholder groups: client representatives, consultants and contractors. A total of 67 IPQMS process items were examined, comprising 20 client representative items, 22 consultant items and 25 contractor items. Each item was measured across two dimensions: agreement and usage. Rasch analysis was conducted using WINSTEPS to evaluate rating scale functioning, reliability and separation indices, item and person fit, unidimensionality, differential item functioning and item hierarchy. The findings demonstrate that all six instruments showed ordered rating scale functioning, acceptable to excellent reliability, meaningful separation indices, productive item fit and essential unidimensionality. Several items with elevated fit statistics were retained due to their theoretical relevance and contribution to the IPQMS construct. The results confirm that the IPQMS agreement and usage instruments are psychometrically sound and suitable for subsequent critical process identification and structural model development. The study contributes to construction quality management research by demonstrating that role-specific IPQMS processes can be empirically validated through Rasch measurement, thereby providing a defensible measurement foundation for future critical process identification and logit-based structural positioning.
Keywords
Integrated Project Quality Management System; IPQMS; Rasch Measurement Model; construction quality management; instrument validation; project quality process; agreement; usage
Downloads
References
1. Andrich, D. (1978). A rating formulation for ordered response categories. Psychometrika, 43(4), 561–573. [Google Scholar] [Crossref]
2. Arditi, D., & Gunaydin, H. M. (1997). Total quality management in the construction process. International Journal of Project Management, 15(4), 235–243. https://doi.org/10.1016/S0263-7863(96)00076-2 [Google Scholar] [Crossref]
3. Arman, U. D., Suraji, A., & Hidayat, B. (2025). A conceptual framework for the process protocol of integration quality, safety, health and sustainable construction management systems for infrastructure projects in Indonesia. E3S Web of Conferences. https://doi.org/10.1051/e3sconf/202560416006 [Google Scholar] [Crossref]
4. Bernardo, M., Casadesus, M., Karapetrovic, S., & Heras, I. (2009). How integrated are environmental, quality and other standardized management systems? An empirical study. Journal of Cleaner Production, 17(8), 742–750. https://doi.org/10.1016/j.jclepro.2008.11.003 [Google Scholar] [Crossref]
5. Bhutto, K. (2005). An integrated management system for construction quality, safety and environment: A framework for IMS. Construction Management and Economics, 23(3), 245–253. https://doi.org/10.1080/15623599.2005.10773074 [Google Scholar] [Crossref]
6. Bond, T. G., & Fox, C. M. (2015). Applying the Rasch Model: Fundamental Measurement in the Human Sciences (3rd ed.). Routledge. [Google Scholar] [Crossref]
7. Boone, W. J., Staver, J. R., & Yale, M. S. (2014). Rasch Analysis in the Human Sciences. Springer. [Google Scholar] [Crossref]
8. Bubshait, A. A., & Al-Atiq, T. H. (1999). ISO 9000 quality standards in construction. Journal of Management in Engineering, 15(6), 41–46. [Google Scholar] [Crossref]
9. Chountalas, P. T., & Lagodimos, A. G. (2025). Integrated management systems: A content and bibliometric analysis. The TQM Journal, 37(7), 1827–1873. https://doi.org/10.1108/TQM-04-2024-0164 [Google Scholar] [Crossref]
10. Dahlin, G., & Isaksson, R. (2017). Integrated management systems: Interpretations, results, opportunities. The TQM Journal, 29(3), 528–542. https://doi.org/10.1108/TQM-01-2016-0004 [Google Scholar] [Crossref]
11. de Nadae, J., Carvalho, M. M., & Vieira, D. R. (2021). Integrated management systems as a driver of sustainability performance: Exploring evidence from multiple-case studies. International Journal of Quality & Reliability Management, 38(3), 800–821. https://doi.org/10.1108/IJQRM-12-2019-0386 [Google Scholar] [Crossref]
12. Derakhshan, R., Turner, R., & Mancini, M. (2019). Project governance and stakeholders: A literature review. International Journal of Project Management, 37(1), 98–116. https://doi.org/10.1016/j.ijproman.2018.10.007 [Google Scholar] [Crossref]
13. Golabchi, H., Abellanosa, A. D., Lefsrud, L., Pereira, E., & Mohamed, Y. (2024). A comprehensive systematic review of safety leading indicators in construction. Safety Science, 172, 106433. https://doi.org/10.1016/j.ssci.2024.106433 [Google Scholar] [Crossref]
14. International Organization for Standardization. (2015). The process approach in ISO 9001:2015. https://www.iso.org/iso/iso9001_2015_process_approach.pdf [Google Scholar] [Crossref]
15. Leong, T. K., Zakuan, N., & Saman, M. Z. M. (2014). Review of quality management system research in construction industry. International Journal of Productivity and Quality Management, 13(1), 105–123. https://doi.org/10.1504/IJPQM.2014.057975 [Google Scholar] [Crossref]
16. Linacre, J. M. (2002). Optimizing rating scale category effectiveness. Journal of Applied Measurement, 3(1), 85–106. [Google Scholar] [Crossref]
17. Linacre, J. M. (2023). A user’s guide to WINSTEPS Rasch-model computer programs. Winsteps.com. [Google Scholar] [Crossref]
18. Musayeva, S. A. (2024). Methodological basis of the quality management concept system in construction industry enterprises. American Journal of Economics and Business Management, 7(9), 123–135. https://doi.org/10.31150/ajebm.v7i9.2931 [Google Scholar] [Crossref]
19. Oppong, G. D., Chan, A. P. C., & Dansoh, A. (2017). A review of stakeholder management performance attributes in construction projects. International Journal of Project Management, 35(6), 1037–1051. https://doi.org/10.1016/j.ijproman.2017.04.015 [Google Scholar] [Crossref]
20. Pheng, L. S., & Teo, J. A. (2004). Implementing total quality management in construction firms. Journal of Management in Engineering, 20(1), 8–15. [Google Scholar] [Crossref]
21. Riaz, H., Khan, K. I. A., Ullah, F., Tahir, M. B., Alqurashi, M., & Alsulami, B. T. (2023). Key factors for implementation of total quality management in construction sector: A system dynamics approach. Ain Shams Engineering Journal, 14(3), 101903. https://doi.org/10.1016/j.asej.2022.101903 [Google Scholar] [Crossref]
22. Rofi’udin, M., & Latief, Y. (2018). Integration process models of quality, safety, health and environmental management systems to achieve sustainability construction. In Proceedings of the International Conference on Industrial Engineering and Operations Management (pp. 1–12). IEOM Society International. [Google Scholar] [Crossref]
23. Sheikh, N. A., Kamal, M. A., & Ali, T. H. (2019). Evaluation of key factors influencing process quality during construction projects in Pakistan. [Journal details to be verified]. [Google Scholar] [Crossref]
24. Simon, A., Karapetrovic, S., & Casadesus, M. (2012). Difficulties and benefits of integrated management systems. Industrial Management & Data Systems, 112(5), 828–846. https://doi.org/10.1108/02635571211232406 [Google Scholar] [Crossref]
25. Widjajakusuma, J., Tanuhendrata, M. S., & Suraji, A. (2023). A conceptual framework for integrating QSHE in construction. IOP Conference Series: Earth and Environmental Science, 1195(1), Article 012041. https://doi.org/10.1088/1755-1315/1195/1/012041 [Google Scholar] [Crossref]
26. Wright, B. D., & Masters, G. N. (1982). Rating Scale Analysis. MESA Press. [Google Scholar] [Crossref]
27. Wright, B. D., & Stone, M. H. (1979). Best Test Design. MESA Press. [Google Scholar] [Crossref]
28. Zeng, S. X., Shi, J. J., & Lou, G. X. (2007). A synergetic model for implementing an integrated management system: An empirical study in China. Journal of Cleaner Production, 15(18), 1760–1767. https://doi.org/10.1016/j.jclepro.2006.03.007 [Google Scholar] [Crossref]
Metrics
Views & Downloads
Similar Articles
- Assessment of the Role of Artificial Intelligence in Repositioning TVET for Economic Development in Nigeria
- Teachers’ Use of Assure Model Instructional Design on Learners’ Problem Solving Efficacy in Secondary Schools in Bungoma County, Kenya
- “E-Booksan Ang Kaalaman”: Development, Validation, and Utilization of Electronic Book in Academic Performance of Grade 9 Students in Social Studies
- Analyzing EFL University Students’ Academic Speaking Skills Through Self-Recorded Video Presentation
- Major Findings of The Study on Total Quality Management in Teachers’ Education Institutions (TEIs) In Assam – An Evaluative Study