The Use of Blockchain Technology to Improve Payment Delays in Malaysian Construction Industry

Authors

Salman Riazi Mehdi Riazi

School of Housing, Building, and Planning, Universiti Sains Malaysia, Penang, Malaysia. (Malaysia)

Alotaibi Majed Mansour B

School of Housing, Building, and Planning, Universiti Sains Malaysia, Penang, Malaysia. (Malaysia)

Nurul Izzah Azmi

HCK Capital Group Berhad, HCK Tower 8, PJU 8, Jalan Damansara, Empire City, 47820 Petaling Jaya, Selangor, Malaysia. (Malaysia)

Article Information

DOI: 10.47772/IJRISS.2026.100700141

Subject Category: Education

Volume/Issue: 10/7 | Page No: 1943-1956

Publication Timeline

Submitted: 2026-07-13

Accepted: 2026-07-18

Published: 2026-07-27

Abstract

Blockchain technology is an emerging technology that has been linked with many benefits including improving construction industry payment timeliness. Despite the well documented positives of blockchain to improve payment practices such as automated payments through smart contracts, faster payments processing, increased transparency, reduced disputes, better cash flow management etc., its actual implementation in Malaysia has been rather scarce. This study therefore looks into blockchain technology adoption in Malaysian construction industry and its potential to improve payments delays. Focus was placed on investigating the prevalence of payment delays in the industry, industry awareness on blockchain technology, current adoption status, industry readiness as well as the potential of blockchain to improve payment timeliness in Malaysian construction industry. Data collection involved the use of semi-structured interviews on six (6) experts, all of them being quantity surveyors with a minimum of five (5) years’ continuous experience as well as relevant knowledge and experience with blockchain technology. Interview responses were analyzed using content analysis to identify key themes by scrutinizing the frequency of recurring topics. Results indicated that delayed payments are indeed a recurring dilemma due to the domination of inefficient conventional practices and despite the potential of blockchain technology to overcome the problem, it has remained uncommon in the industry practice. Even though exposure to this technology has taken place, awareness on blockchain is quite shallow with very limited actual implementations. Lack of digital maturity, poor infrastructure, domination of old practices and resistance to change have been among the culprits for this unhealthy scenario. Anyhow, the respondents did support the notion that blockchain-enabled automated payment mechanisms have potential to address many shortcomings of old payment practices. This therefore sheds some light at the end of tunnel and portrays strong optimism for future blockchain initiatives in bettering payment processes in Malaysia.

Keywords

Blockchain Technology, Construction Industry, Malaysia, Payment Process, Payment Delays

Downloads

References

1. Abeysekera, V. (2012). A conceptual framework for client financed construction and non-traditional approaches for financing construction work. In S. Senaratne & Y. G. Sandanayake (Eds.), Global Challenges in Construction Industry: Proceedings of the World Construction Symposium 2012 (pp. 42–49). Ceylon Institute of Builders. [Google Scholar] [Crossref]

2. Al-Ashmori, Y. Y., Othman, I., & Al-Aidrous, A. H. M. (2022). “Values, challenges, and critical success factors” of building information modelling (BIM) in Malaysia: experts perspective. Sustainability, 14(6), 3192. [Google Scholar] [Crossref]

3. Alreck, P. L., & Settle, R. B. (2004). The Survey Research Handbook: Guidelines and Strategies for Conducting a Survey (3rd ed.). McGraw-Hill. [Google Scholar] [Crossref]

4. Ameer Ali, N. A. N. (2006). A “Construction Industry Payment and Adjudication Act”: Reducing payment default and increasing dispute resolution efficiency in construction. Masters Builders, 3, 4-14. [Google Scholar] [Crossref]

5. Badroldin, M. K. A. M., Hamid, A. R. A., Raman, S. A., Zakaria, R., & Mohandes, S. R. (2016). Late payment practices in the Malaysian construction industry. Malaysian Journal of Civil Engineering, 28. [Google Scholar] [Crossref]

6. Behera, P., Mohanty, R. P., & Prakash, A. (2015). Understanding construction supply chain management. Production Planning & Control, 26(16), 1332-1350. [Google Scholar] [Crossref]

7. Berliner, D. C. (2004). Describing the behavior and documenting the accomplishments of expert teachers. Bulletin of science, technology & society, 24(3), 200-212. [Google Scholar] [Crossref]

8. Bryman, A. (2016). Social research methods. Oxford university press. [Google Scholar] [Crossref]

9. Celik, B. G., Abraham, Y. S., & Attaran, M. (2024). Unlocking blockchain in construction: A systematic review of applications and barriers. Buildings, 14(6), 1600. [Google Scholar] [Crossref]

10. Chein, I. (1981). Appendix: An introduction to sampling. Selltiz, Wrightsman & Cook’s research methods in social relations, 4, 418-441. [Google Scholar] [Crossref]

11. Chia, F. C., Ong, J. K. K., & Yong, F. Y. Y. (2020). Readiness and acceptance of blockchain technology in the Malaysian construction industry. In 26TH Annual Pacific Rim Real Estate Society Conference, Canberra, Australia, 19th–22nd January. [Google Scholar] [Crossref]

12. Construction Industry Development Board Malaysia. (2020). Construction 4.0 strategic plan 2021–2025. [Google Scholar] [Crossref]

13. Construction Industry Development Board Malaysia. (2022, March 31). The adoption of technology in the construction industry. https://www.cidb.gov.my/eng/the-adoption-of-technology-in-the-construction-industry/ [Google Scholar] [Crossref]

14. Dainty, A. R., Millett, S. J., & Briscoe, G. H. (2001). New perspectives on construction supply chain integration. Supply chain management: An international journal, 6(4), 163-173. [Google Scholar] [Crossref]

15. Dakhli, Z., Lafhaj, Z., & Mossman, A. (2019). The potential of blockchain in building construction. Buildings, 9(4), 77. [Google Scholar] [Crossref]

16. Dal Mas, F., Massaro, M., Ndou, V., & Raguseo, E. (2023). Blockchain technologies for sustainability in the agrifood sector: A literature review of academic research and business perspectives. Technological Forecasting and Social Change, 187, 122155. [Google Scholar] [Crossref]

17. Danuri, M. M., Munaaim, M. C., Rahman, H. A., & Hanid, M. (2006, November). Late and non-payment issues in the Malaysian Construction Industry-Contractor's perspective. In International Conference on Construction, Culture, Innovation and Management (CCIM) (pp. 26-29). [Google Scholar] [Crossref]

18. Delbecq, A.L., Van de Ven, A.H. and Gustafson, D.H. (1975) Group Techniques for Program Planning: A Guide to Nominal Group and Delphi Processes. Scott, Foresman Glenview. [Google Scholar] [Crossref]

19. Department of Statistics Malaysia. (2025). Gross domestic product by economic activity, Malaysia. https://www.dosm.gov.my/ [Google Scholar] [Crossref]

20. Din, N. M. D. N., & Ismail, Z. (2014). Construction industry payment and adjudication act (CIPAA) remedying Payment Issues: CIDB G7 contractor's perspective. Journal of Technology Management and Business, 1(1). [Google Scholar] [Crossref]

21. Dzulkalnine, N. (2015). An analysis on causes, impact and strategies of payment among contractors in Malaysian construction industry (Doctoral dissertation, Master’s thesis, Faculty of Business and Economics, Universiti Pendidikan Sultan Idris). [Google Scholar] [Crossref]

22. Fellows, R. F., & Liu, A. M. (2021). Research methods for construction. John Wiley & Sons.’ [Google Scholar] [Crossref]

23. Hallowell, M. R., & Gambatese, J. A. (2010). Qualitative research: Application of the Delphi method to CEM research. Journal of construction engineering and management, 136(1), 99-107. [Google Scholar] [Crossref]

24. Hamid, A. A. A., Mokhtar, A. F., Soh, C. S. C., & Abidin, N. I. Z. (2021). Malaysia–25 years of construction industry progress 1995–2019. [Google Scholar] [Crossref]

25. Hamledari, H., & Fischer, M. (2021). Construction payment automation using blockchain-enabled smart contracts and robotic reality capture technologies. Automation in Construction, 132, 103926. [Google Scholar] [Crossref]

26. Hijazi, A. A., Perera, S., Alashwal, A., & Calheiros, R. N. (2019, June). Blockchain adoption in construction supply chain: A review of studies across multiple sectors. In CIB World Building Congress, Hong Kong (Vol. 2021). [Google Scholar] [Crossref]

27. Hrouga, M., Sbihi, A., & Chavallard, M. (2022). The potentials of combining Blockchain technology and Internet of Things for digital reverse supply chain: A case study. Journal of Cleaner Production, 337, 130609. [Google Scholar] [Crossref]

28. Hussain, A. H., Alam, M. R. A., Eni, S., Ani, A. I. C., & Roslan, A. F. (2020). Assessing the organisations decision for digital transformation through BIM implementation in Malaysia. MCRJ Spec, (2020), 11. [Google Scholar] [Crossref]

29. Ismail, I., Memon, A. H., & Rahman, I. A. (2013). Expert opinion on risk level for factors affecting time and cost overrun along the project lifecycle in Malaysian construction projects. International Journal of Construction Technology and Management, 1(2), 2289. [Google Scholar] [Crossref]

30. Jasimin, T. H., Ali, H. M., Razali, M. N. M., & Daud, S. M. (2023). Potential opportunities of blockchain technology in streamlining the Malaysian commercial office building operation management process. PLANNING MALAYSIA, 21. [Google Scholar] [Crossref]

31. Judi, S. S., & Rashid, R. A. (2010). Contractor’s right of action for late or non-payment by the employer. Journal of Surveying, Construction and Property, 1(1). [Google Scholar] [Crossref]

32. Kiu, M. S., Chau, K. Y., Wong, P. F., Ramayah, T., & Yap, J. B. H. (2025, October). Blockchain adoption in construction supply chains: Drivers, barriers and strategies. In IOP Conference Series: Earth and Environmental Science (Vol. 1548, No. 1, p. 012009). IOP Publishing. [Google Scholar] [Crossref]

33. Lei, J., Indiran, L., & Haiyat Abdul Kohar, U. (2023). Barriers to digital transformation among MSME in tourism industry: cases studies from Bali. International Journal of Academic Research in Business and Social Sciences, 13(3), 844-858. [Google Scholar] [Crossref]

34. Lewis, R., McPartland, J., & Ranjan, R. (2017). Blockchain and financial market innovation. Economic Perspectives, 41(7), 1-17. [Google Scholar] [Crossref]

35. Li, J., & Kassem, M. (2021). Applications of distributed ledger technology (DLT) and Blockchain-enabled smart contracts in construction. Automation in construction, 132, 103955. [Google Scholar] [Crossref]

36. Li, J., Greenwood, D., & Kassem, M. (2019). Blockchain in the built environment and construction industry: A systematic review, conceptual models and practical use cases. Automation in construction, 102, 288-307. [Google Scholar] [Crossref]

37. Lim, S. J. (2021). A Study on the Implementation of Construction Industry Payment and Adjudication Act 2012 (CIPAA) and Its Challenges (Doctoral dissertation, Tunku Abdul Rahman University College). [Google Scholar] [Crossref]

38. Martinovic, I., Kello, L., & Sluganovic, I. (2017). Blockchains for governmental services: Design principles, applications, and case studies. Center for Technology and Global Affairs, University of Oxford. [Google Scholar] [Crossref]

39. Master Builders Association Malaysia. (2005). Quarterly survey on progress payment issue in the construction industry: 3rd quarter 2005. [Google Scholar] [Crossref]

40. Mazlan, N. N., Xin, C. W., Mustafa, M. H., Mahdzir, M., & Danuri, M. S. M. (2025). Exploring the challenges in implementing blockchain technology in contract management for quantity surveying profession in Malaysian construction industry. Planning Malaysia, 23. [Google Scholar] [Crossref]

41. Mehdi Riazi, S. R. (2014). The use of supply chain management to reduce delays as result of pre-construction deficiencies in Malaysian public sector construction projects (Doctoral dissertation, Queensland University of Technology). [Google Scholar] [Crossref]

42. Mohamad, Z., Omar, K. A., & Mustafar, N. S. (2024). Smart construction: The next paradigm for Malaysia construction industry. https://smart.cidb.gov.my/article/smart-construction-the-next-paradigm-for-malaysia-construction-industry-390 [Google Scholar] [Crossref]

43. Mohd Nawi, M. N., Mydin, M. A. O., Nursal, A. T., & Abdul Nifa, F. A. (2015). Payment issues in Malaysia industrialised building system (IBS): literature visit. Advances in Environmental Biology (AEB), 9(4), 185-188. [Google Scholar] [Crossref]

44. Nanayakkara, S., Perera, S., & Senaratne, S. (2019, June). Stakeholders’ perspective on blockchain and smart contracts solutions for construction supply chains. In CIB World Building Congress (pp. 17-21). [Google Scholar] [Crossref]

45. Nanayakkara, S., Perera, S., Senaratne, S., Weerasuriya, G. T., & Bandara, H. M. N. D. (2021a, May). Blockchain and smart contracts: A solution for payment issues in construction supply chains. In Informatics (Vol. 8, No. 2, p. 36). MDPI. [Google Scholar] [Crossref]

46. Nanayakkara, S., Rodrigo, M. N. N., Perera, S., Weerasuriya, G. T., & Hijazi, A. A. (2021b). A methodology for selection of a Blockchain platform to develop an enterprise system. Journal of Industrial Information Integration, 23, 100215. [Google Scholar] [Crossref]

47. Nasir, S. R. M., Sahidi, N. A. M., & Hasim, S. (2024, December). Digital Transformation Barriers in the Malaysian Construction Industry: Staff Competency, and Company Initiatives. In International Conference on Innovation & Entrepreneurship in Computing, Engineering & Science Education (InvENT 2024) (pp. 109-118). Atlantis Press. [Google Scholar] [Crossref]

48. Nawari, N. O., & Ravindran, S. (2019). Blockchain technology and BIM process: Review and potential applications. Journal of Information Technology in Construction, 24. [Google Scholar] [Crossref]

49. Nekooie, M. I. M. M. A., & Kamaruddin, N. B. C. (2012). The Adequacy of Contractual Provisions in Managing Construction Failure in Malaysia. litigation, 4(1). [Google Scholar] [Crossref]

50. Okoli, C., & Pawlowski, S. D. (2004). The Delphi method as a research tool: an example, design considerations and applications. Information & management, 42(1), 15-29. [Google Scholar] [Crossref]

51. Othman, I., Al-Ashmori, Y. Y., Rahmawati, Y., Amran, Y. M., & Al-Bared, M. A. M. (2021). The level of building information modelling (BIM) implementation in Malaysia. Ain Shams Engineering Journal, 12(1), 455-463. [Google Scholar] [Crossref]

52. Patton, M. Q. (2014). Qualitative research & evaluation methods: Integrating theory and practice. Sage publications. [Google Scholar] [Crossref]

53. Perera, S., Nanayakkara, S., Rodrigo, M. N. N., Senaratne, S., & Weinand, R. (2020). Blockchain technology: Is it hype or real in the construction industry?. Journal of industrial information integration, 17, 100125. [Google Scholar] [Crossref]

54. Persons, T. M. (2019, September). Science & tech spotlight: Blockchain & distributed ledger technologies. U.S. Government Accountability Office. https://www.gao.gov/assets/gao-19-704sp.pdf [Google Scholar] [Crossref]

55. Pill, J. (1971). The Delphi method: substance, context, a critique and an annotated bibliography. Socio-economic planning sciences, 5(1), 57-71. [Google Scholar] [Crossref]

56. Ramachandra, T., & Rotimi, J. O. (2011). The nature of payment problems in the New Zealand construction industry. Australasian Journal of Construction Economics and Building, The, 11(2), 22-33. [Google Scholar] [Crossref]

57. Ramachandra, T., & Rotimi, J. O. B. (2015). Mitigating payment problems in the construction industry through analysis of construction payment disputes. Journal of legal affairs and dispute resolution in engineering and construction, 7(1), A4514005. [Google Scholar] [Crossref]

58. Riazi, S. R. M., & Nawi, M. N. M. (2018). Project delays in the Malaysian public sector: Causes, pathogens and the supply chain management approach. International Journal of Technology, 9(8). [Google Scholar] [Crossref]

59. Riazi, S. R. M., Ismail, R., Nawi, M. N. M., Shaharizan, M. F., Yunus, R., & Alhawatmeh, O. S. (2019). Payment issues in industrialized building system (IBS) projects in Malaysia: Towards a better approach. Int. J. Supply Chain. Manag, 8, 644-650. [Google Scholar] [Crossref]

60. Riazi, S. R. M., Nawi, M. N. M., & Yaziz, M. F. A. (2020). Developing a holistic project time management framework utilizing fundamental supply chain management (SCM) tools to overcome delay in Malaysian public sector building projects. International Journal of Sustainable Construction Engineering and Technology, 11(1), 31-41. [Google Scholar] [Crossref]

61. Rodrigo, M. N. N., Perera, S., Senaratne, S., & Jin, X. (2020). Potential application of blockchain technology for embodied carbon estimating in construction supply chains. Buildings, 10(8), 140. [Google Scholar] [Crossref]

62. Rodrigues, B., Bocek, T., & Stiller, B. (2018). The use of blockchains: Application-driven analysis of applicability. In Advances in Computers (Vol. 111, pp. 163-198). Elsevier. [Google Scholar] [Crossref]

63. Salleh, R. M., Mustaffa, N. E., & Rahiman, N. A. (2020). The adoption of building information modelling and intelligent contract to payment process in Malaysian conventional contract. Journal of Computational and Theoretical Nanoscience, 17(2-3), 1378-1387. [Google Scholar] [Crossref]

64. Shojaei, A., Flood, I., Moud, H. I., Hatami, M., & Zhang, X. (2019, October). An implementation of smart contracts by integrating BIM and blockchain. In Proceedings of the Future Technologies Conference (pp. 519-527). Cham: Springer International Publishing. [Google Scholar] [Crossref]

65. Shojaei, A., Ketabi, R., Razkenari, M., Hakim, H., & Wang, J. (2021). Enabling a circular economy in the built environment sector through blockchain technology. Journal of Cleaner Production, 294, 126352. [Google Scholar] [Crossref]

66. Singh, A. K., Kumar, V. P., Dehdasht, G., Mohandes, S. R., Manu, P., & Rahimian, F. P. (2023). Investigating the barriers to the adoption of blockchain technology in sustainable construction projects. Journal of cleaner production, 403, 136840. [Google Scholar] [Crossref]

67. Sonmez, R., Ahmadisheykhsarmast, S., & Güngör, A. A. (2022). BIM integrated smart contract for construction project progress payment administration. Automation in Construction, 139, 104294. [Google Scholar] [Crossref]

68. Turk, Ž., & Klinc, R. (2017). Potentials of blockchain technology for construction management. Procedia engineering, 196, 638-645. [Google Scholar] [Crossref]

69. Waqar, A., Qureshi, A. H., & Alaloul, W. S. (2023). Barriers to building information modeling (BIM) deployment in small construction projects: Malaysian construction industry. Sustainability, 15(3), 2477. [Google Scholar] [Crossref]

70. Werbach, K., & Cornell, N. (2017). Contracts ex machina. Duke law journal, 313-382. [Google Scholar] [Crossref]

71. Wu, H., Zhang, P., Li, H., Zhong, B., Fung, I. W., & Lee, Y. Y. R. (2022). Blockchain technology in the construction industry: Current status, challenges, and future directions. Journal of construction engineering and management, 148(10), 03122007. [Google Scholar] [Crossref]

72. Xu, Y., Chong, H. Y., & Chi, M. (2023). Modelling the blockchain adoption barriers in the AEC industry. Engineering, Construction and Architectural Management, 30(1), 125-153. [Google Scholar] [Crossref]

73. Zhang, P., Schmidt, D. C., White, J., & Lenz, G. (2018). Blockchain technology use cases in healthcare. In Advances in computers (Vol. 111, pp. 1-41). Elsevier. [Google Scholar] [Crossref]

74. Zheng, Z., Xie, S., Dai, H. N., Chen, W., Chen, X., Weng, J., & Imran, M. (2020). An overview on smart contracts: Challenges, advances and platforms. Future Generation Computer Systems, 105, 475-491. [Google Scholar] [Crossref]

75. Zheng, Z., Xie, S., Dai, H. N., Chen, X., & Wang, H. (2018). Blockchain challenges and opportunities: A survey. International journal of web and grid services, 14(4), 352-375. [Google Scholar] [Crossref]

76. Zilin, Z., Jing, K. T., Yee, H. C., Zihao, D., & Yao, L. (2023). Blockchain technology in construction supply chain management: enhance transaction speed, cost effectiveness and security. Journal of advanced research in applied sciences and engineering technology, 32(3), 400-420. [Google Scholar] [Crossref]

77. Zuki, W. N. N. N. W., Sarpin, N., & Masrom, M. A. N. (2020). Strategi bagi Meningkatkan Penggunaan ‘Construction Industry Payment & Adjudication Act’(CIPAA) dalam Industri Pembinaan. Research in Management of Technology and Business, 1(1), 514-527. [Google Scholar] [Crossref]

Metrics

Views & Downloads

Similar Articles